Power system fault automatic repair method and device based on multi-station cooperation
A fault repair and power system technology, applied in the direction of circuit devices, constraint-based CAD, table lookup devices, etc., can solve problems such as low repair efficiency, single repair strategy, and poor reliability of repair methods, so as to improve adaptability and efficiency , The effect of improving the degree of automation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] Such as figure 1 As shown, a method for automatically repairing power system faults based on multi-station coordination provided in this embodiment includes the following steps:
[0048] S1: a step of fault information monitoring, which specifically includes:
[0049] S11: Lock the area where the power system fault occurs according to the grid power flow value;
[0050] S12: Obtain the location of the fault element and the fault type through the power detection equipment installed in the fault occurrence area; and upload the detected fault information to the control master station;
[0051] S2: the step of controlling the master station to generate a fault recovery strategy, which specifically includes:
[0052] S21: According to the power network topology model under the normal operation mode of the power grid, perform power flow calculation on the power system to obtain the initial power flow result;
[0053] S22: Find a fault recovery strategy from the fault recov...
Embodiment 2
[0066] This embodiment provides a power system fault automatic repair device based on multi-station coordination, which includes:
[0067] A fault information monitoring unit, which specifically implements:
[0068] Lock the area where the power system fault occurs according to the grid power flow value; obtain the location of the fault component and the type of fault through the power detection equipment installed in the fault area; and upload the detected fault information to the control master station;
[0069] The control master station generates a fault recovery strategy unit, which specifically implements:
[0070] According to the power network topology model under the normal operation mode of the power grid, the power flow calculation of the power system is carried out to obtain the initial power flow results;
[0071] Searching for a fault recovery strategy from the fault recovery strategy table, the fault recovery strategy includes at least one fault recovery behavi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com