Coal face periodic pressure analysis method and device and electronic equipment
A technology of coal mining face and periodic pressure, applied in the direction of electrical digital data processing, special data processing applications, instruments, etc., can solve problems such as deviation of analysis results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] like figure 1 As shown, the embodiment of the present invention provides a method for analyzing the periodic pressure of a coal mining face, including:
[0059] S101. Obtain the pressure value collected by the target support within the sampling time period, the number of the pressure value is at least two, and each pressure value corresponds to a collection time point;
[0060] In this step, the target support can be any hydraulic support used to control the mine pressure of the coal mining face; any time period in the coal mining face advancement process can be used as the sampling time period, and the sampling time The length of the sampling period is generally one month, and when the advancing speed of the working face is fast, the length of the sampling period can be shortened accordingly.
[0061] During the sampling period, the target support periodically collects pressure from the roof, and each collected pressure value corresponds to its collection time point. ...
Embodiment 2
[0124] like image 3 As shown, the embodiment of the present invention provides a coal mining face periodic pressure analysis device, including:
[0125] The first acquisition unit 21 is configured to acquire the pressure values collected by the target bracket within the sampling time period, the number of the pressure values is at least two, and each of the pressure values corresponds to a collection time point;
[0126] The first construction unit 22 is configured to construct a first discrete data sequence according to the collection time sequence of the pressure value;
[0127] The second acquiring unit 23 is configured to acquire the maximum value in the first discrete data sequence;
[0128] The second construction unit 24 is configured to construct a maximum value set according to the maximum value and the serial number of the maximum value in the first discrete data sequence, and in the maximum value set, each The above maximum value corresponds to a serial num...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


