Unlock instant, AI-driven research and patent intelligence for your innovation.

High-altitude net rack mobile platform construction method

A mobile platform and construction method technology, applied in industrial buildings, roofs, roof drainage, etc., can solve problems such as the difficulty of siphoning rainwater suspension beams and rainwater pipes, the inability of mechanical shifts to carry out large-scale operations, and the unevenness of the construction site. , to achieve the effect of shortening the construction period, simple facilities and high construction quality

Inactive Publication Date: 2021-02-26
CHINA CONSTR IND & ENERGY ENG GRP CO LTD
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, at present, the composite material center workshops are all large spaces and high-altitude grids (topspin balls, bottom spin balls and their connecting rods are welded and installed). When constructing and installing siphon rainwater suspension beams and rainwater pipes, it is very difficult to use electromechanical installation. The construction height is high, the construction site is uneven, and the mechanical shift cannot carry out large-scale operations. For example, it is very difficult to install the siphon rainwater suspension beams and rainwater pipes with the articulating arm type aerial work vehicle, the construction period is long, and the cost is high. Economical and Poor social benefits

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0019] Embodiment: A construction method for a high-altitude grid mobile platform. This embodiment is suitable for the high-altitude grid mobile platform of large workshops and super-large workshops, the welding construction of siphon rainwater suspension beams and the installation of siphon rainwater pipes, especially for high-altitude grids larger than 15 meters. Set up a large factory building. The mobile platform is installed on the high-altitude grid mainly by setting up a simmer on the connecting rod of the high-altitude grid. There are guardrails on both sides of the mobile platform, and a safety rope is set on the high-altitude grid according to the moving direction. A springboard is set up on the bottom-spin ball connecting rod of the net frame to facilitate the construction workers to walk, and the construction personnel use steel ladders from the springboard to the high-altitude mobile platform. The operator hangs the safety belt on the safety rope on the mobile pla...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high-altitude net rack mobile platform construction method, which is suitable for welding construction of high-altitude net rack mobile platforms and siphon rainwater suspension beams as well as installation of siphon rainwater pipes in large factory buildings and oversized factory buildings, particularly the high-altitude net rack large factory buildings of more than 15meters. According to the method, the siphon rainwater suspension beams and the rainwater pipes are operated, constructed and installed in a high-altitude net rack mobile platform mode, so that a siphon rainwater system is rapid, simple and convenient to install, the functional requirements for the system are met, and smooth running is realized, so that good economic and social benefits are achieved; and meanwhile, the construction period is greatly shortened in advance, the construction efficiency of field workers is improved, the construction quality is increased, the construction cost is reduced, a siphon rainwater pipe network system can operate stably, and therefore smooth drainage requirements in continuous rainy days in summer are met.

Description

technical field [0001] The invention relates to the field of building construction, and is suitable for the high-altitude grid mobile platform of large factory buildings and super large factory buildings, the welding construction of siphon rainwater suspension beams and the installation of siphon rainwater pipes. In particular, it is a large factory building with a high-altitude grid frame that is more than 15 meters high, and it is specifically a construction method for a high-altitude grid mobile platform. Background technique [0002] In recent years, a complete set of effective construction operations and installation procedures have been gradually formed for the electromechanical installation of high-altitude grid construction such as large factories and gymnasiums, thereby greatly improving construction safety and installation quality, while saving costs and maximizing benefits. [0003] However, at present, the composite material center workshops are all large spaces ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04G21/00E04H5/02E04D13/064E04D13/04E04D13/08
CPCE04D13/04E04D13/064E04D13/08E04D2013/084E04G21/00E04H5/02
Inventor 夏宁王亮李昌庆沈磊孔伟陈永昌王少华王健男芮立平
Owner CHINA CONSTR IND & ENERGY ENG GRP CO LTD