High-water-content soft soil dewatering excavation integral trenching pipeline construction method
A high water content, pipeline construction technology, applied in the direction of excavation, pipeline laying and maintenance, soil protection, etc., can solve the problems of cofferdam deformation, low safety, low bearing capacity, etc., achieve stable and reliable support, and improve overall performance , Improve the effect of sealing performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
[0037] As an embodiment, the construction method for excavating integral trench pipelines in soft soil with high water content for precipitation includes the following construction steps:
[0038] 1) For the construction of the cofferdam dewatering structure, the pile-type downwater pipe 11 is inserted into the soil body on both sides of the ditch 87 to be excavated, and the top of the pile-type downwater pipe 11 is connected with the water collecting pipe 14; Pa...