Railway long-chain point mileage mark processing method and device, electronic equipment and storage medium
A processing method and a milestone technology, which are applied in the field of devices, railway long-chain point milestone processing methods, electronic equipment and storage media, and can solve the problems of large coupling between application logic and chain disconnection, trouble, and large engineering influence range.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024]figure 1 This is a flow chart of the railway long chain point mileage processing method in the first embodiment of the present invention, the present embodiment can be applied to the case of processing the position information of the long-chain input point of the railway to obtain a long chain input point. The method can be performed by a railway long chain input point mileage processing apparatus, which can be implemented in a software and / or hardware, and can be configured in an electronic device, such as an electronic device can be a backend server or the like has communication and computing power. device of. Such asfigure 1 As shown, the method specifically includes:
[0025]Step 101: Determine the parameter information of the long chain of the long chain input point according to the long-chain input point of the long-chain input point to be processed, determine the parameter information of the long chain of the long chain input point; wherein the long-chain input point mil...
Embodiment 2
[0073]figure 2 It is a flow chart of the railway long chain point mileage processing method according to the second embodiment of the present invention, and the second embodiment is further optimized on the basis of the first embodiment, and the long chain configuration information includes two different long challenge regulatory systems. Two long chain configuration information obtained is performed. Such asfigure 2 As shown, the method includes:
[0074]Step 201, determine two parameter information of the long chain of the long chain input point according to the two long chain configuration information to be processed according to the long-chain input point of the standby.
[0075]Match according to the kilometers of the kilometers, the 100-meter mark, and the corresponding line number included in the long-chain input point mileage label, and the long chain configuration, including the long chain corresponding to the line number in the long chain configuration. The endpoint is logical i...
Embodiment 3
[0086]Figure 4 This is a schematic structural diagram of the railway long chain point mileage processing apparatus according to the third embodiment of the present invention, and this embodiment can be applied to the case where the long-chain input point flag of the railway is processed to obtain the location information of the long chain input point. Such asFigure 4 As shown, the apparatus includes:
[0087]The long chain parameter determination module 410 is used to determine the parameter information of the long chain of the long chain input point according to the long-chain input point mileage and the pre-set long-chain configuration information according to the long-chain input point of the standby; in which the long-chain input point mileage It is based on one of two different long-chain regulatory systems;
[0088]The long chain point position determination module 420 is configured to determine the location information of the long-chain input point based on the parameter informatio...
PUM
Login to View More Abstract
Description
Claims
Application Information