Mounting method of beam-column connecting joints of prefabricated house steel structure

A technology of beam-column connection and installation method, which is applied in the direction of building structure and construction, and can solve the problems of increasing construction cost and low construction efficiency

Inactive Publication Date: 2021-05-18
CHINA 22MCC GROUP CORP
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This method of construction requires the cooperation of the crane throughout the process, which results in low construction efficiency and virtually increases the construction cost.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mounting method of beam-column connecting joints of prefabricated house steel structure
  • Mounting method of beam-column connecting joints of prefabricated house steel structure
  • Mounting method of beam-column connecting joints of prefabricated house steel structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0025] A method for installing a beam-column connection node of a prefabricated residential steel structure is carried out according to the following steps:

[0026] A. According to the steel structure design manual (such as figure 2 shown), calculate the weld seam, and determine the specification and thickness of the chuck plate 1 used for the steel beam 2 of different tonnage.

[0027] B. According to the specifications and plate thickness of the chuck plate 1 selected in step A, the material is cut in the manufacturing plant for standby, and the welding holes for the beam and column welding seam are reserved on the chuck plate 1 according to the part drawing.

[0028] C. If image 3 As shown, the clamp plate 1 is welded to the ends of the steel beam 2 respectively, one end of the clamp plate 1 is welded and fixed to the end of the steel b...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to steel structure beam-column connection, and particularly relates to a mounting method of beam-column connecting joints of a prefabricated house steel structure. The mounting method comprises the steps that welding seams are calculated, and blanking is conducted in a manufacturing factory for standby application according to the specification and the plate thickness of selected clamping head plates; one end of each selected clamping head plate is welded to the end of a steel beam; after the steel beam welded with the clamping head plates is hoisted to the mounting position, the other ends of the clamping head plates are erected on a bracket of a steel column, and then a hoisting tool is removed; the joints of the beam column are connected by mounting workers through bolts; and the connecting joints are welded finally according to the drawing requirements, and mounting of the whole beam column is completed. According to the mounting method of the beam-column connecting joints of the prefabricated house steel structure, hoisting tools are not needed for whole-process cooperation, the mounting workers can conduct grouping operation, and the mounting efficiency is high.

Description

technical field [0001] The invention relates to beam-column connections of steel structures, in particular to an installation method for beam-column connection nodes of assembled residential steel structures. Background technique [0002] Prefabricated structural buildings are in line with the development of the industry. With the adjustment of the national industrial structure and the advocacy of the construction industry for the concept of green and energy-saving buildings, prefabricated buildings have received more and more attention. As a typical representative of green buildings, steel structures greatly reduce the amount of sand, stone, ash, etc. When buildings are demolished, most of the materials can be recycled or degraded, which can effectively reduce construction waste. [0003] The steel skeleton of the prefabricated house is mostly connected by beam-column bolts. The traditional installation of steel beams is to use tower cranes or other hoisting tools. The con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B1/24E04B1/58
CPCE04B1/2403E04B2001/2406E04B2001/2418
Inventor 任玉荣
Owner CHINA 22MCC GROUP CORP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More