Non-welding connection construction method for PE natural gas pipes

A construction method and technology for natural gas pipes, which are applied in the direction of pipeline connection arrangement, hose connection device, pipe/pipe joint/pipe fitting, etc., can solve the complex operation process and welding technology, the operation method cannot be operated, and the pipeline is twisted or knotted. and other problems, to achieve the effect of prolonging the construction operation season, improving the operation efficiency, and improving the connection efficiency.

Pending Publication Date: 2021-06-22
BEIJING GAS DESIGN
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0015] 1. It needs special thermal welding equipment or electromelting equipment to operate;
[0016] 2. The operation process and welding technology are complex, requiring high technical proficiency of the operators, and special training is required to work on the job. If there is a slight error, the joint must be sawed off, the joint must be re-milled and the welding operation must be performed again;
[0017] 3. The operation site needs to be connected to a stable municipal power supply;
[0018] 4. The operation speed is slow, it takes about 25-50 minutes to weld a joint, and the operation efficiency is low;
[0019] 5. The operation method cannot be operated in winter and windy weather;
[0020] 6. After the welding is completed, the pipe is found to be twisted or knotted, so the pipe can only be sawed and re-welded

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Non-welding connection construction method for PE natural gas pipes
  • Non-welding connection construction method for PE natural gas pipes
  • Non-welding connection construction method for PE natural gas pipes

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0055] like Figure 3-Figure 5 As shown, the non-welded connection construction method of PE natural gas pipe of the present invention comprises the following steps:

[0056] S10, perform section cleaning and chamfering operations on the two sections of PE natural gas pipelines 1 that need to be connected;

[0057] S20, docking and installing the external pressing part and the sealing support part 8, the external pressing part is located outside the sealing supporting part 8, and the inner diameter of the external pressing part is slightly smaller than the outer diameter of the PE natural gas pipeline 1, so as to ensure that the PE natural gas pipeline can be sealed after installation. 1 There is a clamping force to prevent the PE natural gas pipeline 1 from withdrawing from the sealing support 8 under the action of tension;

[0058] S30, immerse the two sections of PE natural gas pipeline 1 in hot water at 95-100°C for 3-5 minutes, so that the two sections of PE natural gas ...

Embodiment 2

[0067] The difference between this embodiment and Embodiment 1 is that the inner surface of the compression sleeve 7 is processed like Image 6 Protrusion 9 as shown or as Figure 7 The structure of the barb 10 shown is to increase the tightness of the connection between the PE natural gas pipeline 1 and the compression sleeve 7 and the sealing support 8, increase the friction between the three, and prevent the PE natural gas pipeline 1 from being pulled out.

[0068] The structure of the protrusion 9 or the barb 10 can be directly manufactured when the compression sleeve 7 is manufactured, or secondary processing can be performed after the compression sleeve 7 is manufactured.

Embodiment 3

[0070] The difference between this embodiment and embodiment 1 is: as Figure 8 As shown, the external pressing part is a cylindrical PE structure 11, and the cylindrical PE structure 11 is made of heat-shrinkable material. The outer wall of the sealing support 8 is only provided with a plurality of sawtooth structures on both sides, and the middle part of the outer wall of the sealing support 8 does not need to process the main baffle and the auxiliary baffle.

[0071] In this embodiment, the non-welded connection construction method of PE natural gas pipes includes the following steps:

[0072] S10, perform section cleaning and chamfering operations on the two sections of PE natural gas pipelines 1 that need to be connected;

[0073] S20, immerse the two sections of PE natural gas pipeline 1 in hot water at 95-100°C for 3-5 minutes, so that the two sections of PE natural gas pipeline 1 appear softened, but the PE natural gas pipeline 1 cannot be obviously deformed;

[0074...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a non-welding connection construction method for PE natural gas pipes, and relates to a pipeline connection method. The non-welding connection construction method for the PE natural gas pipes realizes convenient installation and has high construction efficiency. The non-welding connection construction method for the PE natural gas pipes comprises the following steps that section cleaning and chamfering are conducted on two sections of PE natural gas pipes needing to be connected; an external pressing piece and a sealing supporting piece are installed in a butt joint mode, wherein the external pressing piece is located outside the sealing supporting piece, and the inner diameter of the external pressing piece is slightly smaller than the outer diameter of the PE natural gas pipes; the two sections of PE natural gas pipes are soaked in hot water to be softened; water drops on the surfaces of the two sections of PE natural gas pipes are wiped off; and the sealing supporting piece is aligned to the inner surfaces of the two sections of PE natural gas pipes, the external pressing piece is aligned to the outer surfaces of the two sections of PE natural gas pipes, and the PE natural gas pipes are pushed to a preset position to be extruded between the external pressing piece and the sealing supporting piece.

Description

technical field [0001] The invention relates to the technical field of pipeline connection, in particular to a non-welded connection construction method for PE natural gas pipes. Background technique [0002] PE pipe has many excellent characteristics, such as low temperature resistance, good toughness, high strength, etc., and has been well used in the natural gas industry. PE natural gas pipelines show their talents in some special-purpose occasions, because in these fields, PE natural gas pipelines have great advantages compared with traditional metal material pipelines, such as low cost of pipelines, pipelines can easily achieve large slopes, and pipelines can achieve It can turn at any angle, and it can also ensure the safe use of pipelines. Such as steel pipes, cast iron pipes, and natural gas pipelines, the biggest problem is the common occurrence of pipe corrosion and joint leakage during the service period. PE natural gas pipelines have obvious advantages, perfect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): B29C65/56B29C65/68F16L47/22F16L33/34
CPCB29C65/562B29C65/68B29C65/665B29C66/02241B29C66/0222B29C66/12221B29C66/225B29C66/223B29C66/52294F16L47/22F16L33/34
Inventor 徐明星李清赵青松朱倩翟羽郝蕴华
Owner BEIJING GAS DESIGN
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products