Three-station propelling beam
A propulsion beam and three-station technology, applied in the field of tunnel engineering machinery and mines, can solve the problems of unreported corner error, bulky propulsion beam, displacement of drilling rig, etc., and achieve the effect of lifting speed, simple structure and high production efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] A hydraulic rock bolter, comprising an engineering chassis, a working arm, such as Figure 1-3 The three-station propulsion beam, electrical device, hydraulic device and cab are shown; among them, the engineering chassis is used to provide support for the whole vehicle to ensure the rigidity and strength of the whole vehicle, and the front lateral telescopic form of the legs of the engineering chassis can ensure The stability of the whole vehicle, the electrical device and hydraulic device are used to ensure the normal operation of the three-station propulsion beam and the working arm, and the cab is used to accommodate the driver and the driver manipulates the working arm and the three-station propulsion beam to complete the underground Support work; the three-station propulsion beam is installed on the working arm and adjusted to the vertical state through the working arm;
[0061] In this embodiment, the three-station propelling beam includes a bracket 1 installed on...
Embodiment 2
[0104] The difference between this embodiment and the first embodiment lies in that the anchoring device and the anchoring process are different.
[0105] In this embodiment, the anchoring device includes a bottom plate, a connecting pipe 90, the anchor assembly 53 in Embodiment 1, and a propulsion assembly for driving the push rod 91 to reciprocate; the connecting pipe 90 is fixedly installed on the upper half of the bottom plate, The propulsion assembly is installed on the bottom plate and is located below the connecting pipe 90;
[0106] The connecting pipe 90 includes a first pipe 901, a second pipe 902 and a third pipe 903 communicating with each other, and the first pipe 901 partially protrudes from the bottom plate; the anchor assembly 53 is connected with the third pipe 903 so that the anchoring agent After passing through the third pipeline 903 and the first pipeline 901 in sequence, it enters the hole drilled by the drilling device 4, and the propulsion assembly driv...