Cement fly ash gravel pile perpendicularity control device and construction method
A technology of cement fly ash and control device, which is applied to sheet pile wall, determination of fixed angle, foundation structure engineering, etc., can solve the problems of affecting the bearing capacity of the review foundation and uncontrollable verticality of the pile body.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Embodiment one: if figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 , Image 6 and Figure 7 As shown, a cement fly ash gravel pile verticality control device includes a fixed plate 1, the middle part of one side of the fixed plate 1 is fixed with a connecting rod 2, and the connecting rod 2 is provided with a device to fix the device on the handrail of the pile driver The locking mechanism 3 on the top, the other side of the fixed plate 1 is embedded with a whiteboard 4, the middle part of the top of one side of the whiteboard 4 is fixed with a fixed block 5, and one side of the fixed block 5 is provided with a winding drum 6, and the winding drum The middle part on one side of 6 is fixedly provided with inserting rod 7, and one end fixed block 5 of inserting rod 7 is inserted and connected, and the middle part on one side of fixed block 5 is interspersed with locator 8, and one end of locating member 8 passes through inserting rod 7 and is connected with ...
Embodiment 2
[0028] Embodiment two: if Figure 8 As shown, a cement fly ash gravel pile verticality control device includes a wooden box 16, one side of the wooden box 16 is open, and the middle part of the top of the wooden box 16 is fixed with a second thin line 17, the second The bottom of two thin lines 17 is fixedly provided with the second plumb 18, and the middle part of wooden box 16 inner side is provided with the second two-way scale mark 19.
[0029] Applying the verticality control device of the above-mentioned embodiment 2 to a construction method for controlling the verticality of cement fly ash gravel piles includes the following steps: Step 1. Production of the wooden box 16: the wooden box 16 should be square and processed with wooden formwork At the same time, strictly control the squareness of the wooden box 16, cut it into one piece of 1.1m×0.2m, two pieces of 1.1m×0.1m wooden board, and two pieces of 0.1m×0.2m wooden board, and use iron nails to make it into a cuboid w...
Embodiment 3
[0034] Embodiment three, a construction method for verticality control of cement fly ash macadam pile, comprising:
[0035] Step 1: First, use two total stations or theodolite to adjust the pile driver to a vertical state; Step 2: Fix two verticality control devices on the pile driver body, install them in two vertical directions, and control its lateral direction Perpendicular to the longitudinal direction, the observation readings are more intuitive, and the verticality control device and the pile driver are fixed firmly; Step 3: When the installation is completed and used, adjust the first line of the verticality control device to a stable state by hand, and it is not allowed to appear In the case of a large swing, observe the deviation between the first two-way scale line 15 of the verticality control device and the first thin line 10, and readjust the leveling of the pile foundation if the requirements are not met. Calculate the scale of the allowable deviation of the thi...