Portable boring device for site construction of spare and accessory parts
An on-site construction and portable technology, which is applied in the directions of driving devices, feeding devices, boring/drilling, etc., can solve problems that affect processing efficiency, require very high requirements, and affect processing speed, etc., and achieve reduced labor intensity, high stability, and The effect of ensuring stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as figure 1 As shown, a portable boring device for on-site construction of spare parts, including a boring machine base 1, the left and right sides of the upper end surface of the boring machine base 1 are respectively slidingly arranged with a spindle box 2 and a workpiece installation box 3, and the sliding arrangement is convenient for adjusting the spindle The distance between the box 2 and the workpiece installation box 3, due to the different sizes of the workpieces in the on-site construction, is convenient for the staff to carry out boring processing on the workpiece efficiently;
[0029] It should be noted that the workpiece fixing mechanism in the workpiece installation box 2 is a prior art, and will not be described in detail in the illustrated part of the present invention.
[0030] On the end face of the spindle box 2 facing the workpiece installation box 3, a first boring motor 14 and a second boring motor 15 are movable up and down, and the first bor...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


