A manufacturing process, the technology of the nuclear main pump, which is applied in the manufacturing process of the keyway of the bearing guide ring of the nuclear main pump of the nuclear power plant, can solve the problems such as difficult to meet the precision requirements, cumbersome procedures, and affecting the service life of the bearing guide ring, so as to improve the processing efficiency and ensure The effect of precision requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] A manufacturing and testing process for a nuclear main pump piston ring of a nuclear power plant, comprising the following steps:
[0019] 1) Complete the machining of the bearing guide ring 3 on the forging blank according to the drawing requirements;
[0020] 2) The bearing guide ring 3 is fixed on the worktable 6 of the five-axis machining center 5, and the five-axis machining center 5 cooperates with the right-angle head 4 to process 8 key grooves 2 through the rotation of the workbench 6, and the width of each key groove 2 is 48mm , the vertical distance between the bottom of each keyway 2 and the center of the bearing guide ring 3 is 204.15mm, such as figure 2 shown;
[0021] 3) if figure 1 As shown, the first layer of stellite 1 for each keyway 2 is surfacing: the bearing guide ring 3 is preheated to 450°C, and surfacing is evenly completed on both sides of each keyway 2 by argon tungsten arc welding. After surfacing, use The width of each keyway 2 is 43mm. W...