Embodiment 1
[0037] A device for preventing slag from falling in a converter is composed of a slag avoidance cover 1 and a control trolley 2. The inner diameter of the slag avoidance cover 1 is 800mm and the inner height is 1200mm. The slag avoider 1 and the control trolley 2 are combined together by a support arm 1-7, and a hydraulic holding and drag ring 1-1 is arranged at the front end of the support arm 1-7, and the slag avoider 1 is clamped by hydraulic drive, supporting The rear end of the arm 1-7 is combined with the control trolley 2, the support arm 1-7 can be swung up, down, left and right by controlling the trolley 2, and the control trolley 2 can move back and forth on the track 6. A vent pipe A1-5 and a vent pipe B1-6 are arranged inside the support arm 1-7, and a through hole is provided on the side wall of the slag avoidance cover. And the ventilation pipes B1-6 are opposite to the through holes on the slag shield and are sealed by a gasket. A slag baffle 1-11 with suspensi...
Embodiment 2
[0048] Example 2: The device for preventing slag in the converter in this example is the same as that in Example 1.
[0049] Implement slag blocking for converters with a nominal capacity of 260 tons
[0050] 1) Pass the suspension wire 1-8 of the slag baffle 1-11 through the suspension hole 1-10 and fix it with the suspension pin, and hang the slag baffle on the top of the inner side of the slag shield;
[0051] 2) Move the control trolley 2 away from the tap position of the converter through the track 6, adjust the support arm 1-7 to a position suitable for installing the slag avoidance cover 1, put the slag avoidance cover 1 into the drag ring 1-1, and clamp it;
[0052] 3) When the slag avoidance hood 1 is used for the first time, gas is introduced into the interior of the slag avoidance hood 1 through the ventilation pipe A1-5, and oxygen is introduced into the ventilation pipe B1-6 for baking treatment, so that the temperature reaches 850 ° C;
[0053] 4) After the con...
PUM
| Property | Measurement | Unit |
|---|---|---|