Road engineering construction management method and system based on artificial intelligence
A technology for road engineering and construction management, applied in the direction of neural learning methods, data processing applications, instruments, etc., can solve problems such as low construction efficiency and unreasonable planning of construction tracks, so as to improve efficiency, facilitate progress correction processing, and reasonable construction tracks Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] see figure 1 , which shows a flowchart of an artificial intelligence-based road engineering construction management method provided by an embodiment of the present invention, the method includes the following steps:
[0057] Step S10, obtain the overall image of the area to be operated in the project as an initial image; perform binarization on the initial image to obtain a binary image of the area to be operated, and the pixel value of the pixel in the area to be operated in the binary image is the first One pixel value, the pixel value of the pixel point in the non-operation area in the binary image is the second pixel value; the pixel value of the corresponding position pixel point in the initial image and the area to be operated in the binary image is multiplied to obtain the project to be processed Image of the work area.
[0058] It is understandable that the initial image acquisition method in this step is: the unmanned aerial vehicle equipped with an RGB-D came...
Embodiment 2
[0123] This embodiment proposes a road engineering construction management system based on artificial intelligence, including a memory and a processor, and a computer program running on the memory and on the processor, the processor is coupled with the memory, and the processor implements the computer program when executing the computer program. The artificial intelligence-based road engineering construction management method in embodiment 1.
[0124] Such as Figure 4 The device 600 of the road engineering construction management system composed of specific hardware is shown, and the device may include a CPU 611, which may be a general-purpose CPU, a dedicated CPU, or other execution units for information processing and program execution. Further, the device 600 may also include a large-capacity memory 612 and / or a read-only memory ROM613, wherein the large-capacity memory 612 may be configured to store various types of data, including image data, algorithm data, intermediate...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


