Prestressed anchoring structure system for pier assembly and pier assembly construction method

An anchoring structure and prestressing technology, which is applied in the direction of bridges, bridge materials, bridge construction, etc., can solve the problem of self-locking anchor performance, high requirements for construction sealing performance, complex structure of self-locking anchorage, self-locking anchorage The situation is difficult to detect and other problems, so as to achieve the effect of easy guarantee of anchorage quality, low construction precision requirements and simple structure

Inactive Publication Date: 2021-11-05
LIUZHOU OVM MASCH CO LTD
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] As the pier assembly prestressed connection is suitable for projects with large lateral loads and high seismic requirements, such as sea-crossing bridges, railway bridges, and urban viaducts; the various methods currently commonly used have some shortcomings; for example 1. High-strength threaded steel bars Connection technology, the strength of steel bars is relatively low, the amount is large, and the length is short and needs to be extended, which is expensive and the construction is more complicated;
[0004] 2. The current commonly used self-locking steel strand anchoring connection technology-such as the publication number is CN102535755, and the title of the invention is: "Self-locking prestressed anchorage structure and vertical prestressed anchorage system and construction method" The structure is simple and the construction is relatively simple. Convenient, but this technology has high requirements on self-locking anchor performance and construction sealing performance, because the self-locking anchor structure is pre-embedded in the abutment, it is difficult to detect the self-locking anchorage of the cable body anchor head penetrated later, In addition, the structure of the self-locking anchor is more complicated than that of the conventional fixed end anchor, and the cost is relatively high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prestressed anchoring structure system for pier assembly and pier assembly construction method
  • Prestressed anchoring structure system for pier assembly and pier assembly construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0059] A prestressed anchorage structure system for pier assembly:

[0060] As shown in the figure, the prestressed anchorage structure system for pier assembly includes the bonded fixed-end anchorage I located in the abutment 11, the clip-type tensioned end anchorage II located on the top of the pier column 6, and the steel strands and Pre-buried pipe;

[0061] The bonded fixed-end anchor I located in the abutment 11 is composed of a trumpet-shaped anchor plate 16, an extrusion head 18 at the end of the steel strand 8, a high-strength mortar 15, a steel strand splitter plate 17 and an end cover. The plate 19 is composed of three through holes: through hole I1601, through hole II1602 and through hole III1603 at different heights of the hole wall on the side of the horn-shaped anchor plate 16;

[0062] The clip-type tension-end anchorage II located on the top of the pier column 6 is composed of clip 1, anchor plate 2, tension-end anchor backing plate 3 and spiral rib 4, and its ...

Embodiment 2

[0067] A bridge pier assembly construction method:

[0068] It adopts a kind of prestressed anchorage structure system for bridge pier assembly described in Embodiment 1 to realize the method for bridge pier assembly construction, including the following steps:

[0069] A. Pre-embedded installation of bonded fixed end anchorage and pouring of abutment:

[0070] A1. Pre-embedded installation of bonded fixed end anchorage:

[0071] Before the abutment is poured, the horn-shaped anchor backing plate 16 is vertically installed in the abutment 11, the end cover plate 19 is sealed and connected with the bottom surface of the horn-shaped anchor backing plate 16, the primary grouting pipe 14, the grouting pipe 13 and the secondary grouting pipe 12 are respectively connected to the three through holes on the side of the anchor plate—through hole I1601, through hole II1602, and through hole III1603, and the embedded pipe section II52 is sealed and connected to the top of the horn-shape...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a prestressed anchoring structure system for pier assembly and a pier assembly construction method. The prestressed anchoring structure system comprises a bonding type fixed end anchorage device located in a base, a clamping piece type tensioning end anchorage device located at the top of a pier column, a steel strand cable and an embedded pipe. The embedded pipe is divided into two sections; the embedded pipe section I is arranged in the pier column, the upper end of the embedded pipe section I is hermetically connected with an anchor bearing plate, and the lower end of the embedded pipe section I is positioned at the bottom of a pier column; the embedded pipe section II is arranged in the base, the upper end of the embedded pipe section II is positioned at a splicing surface sealing notch in the top surface of the base, and the lower end of the embedded pipe section II is hermetically connected with the top of the horn-shaped anchor bearing plate; a splicing surface sealing ring is mounted at the splicing surface sealing notch in the top surface of the base; in the assembly state, in an inner cavity of the horn-shaped anchor bearing plate, a steel strand bundle containing the extrusion head and poured high-strength mortar are bonded and anchored, and force is transmitted into the base through the horn-shaped anchor bearing plate; and the bottom of the horn-shaped anchor bearing plate is hermetically connected with the end cover plate. The fixed end of the prestressed anchoring structure system is reliably anchored, and the requirement for pre-embedded construction is low; and the structure is simple and the cost is low.

Description

technical field [0001] The invention relates to a prestressed anchorage structure system for assembling bridge piers and a construction method for assembling bridge piers. Background technique [0002] With the continuous implementation and advancement of the prefabricated assembly method of bridge piers in our country, various assembly connection technologies have been continuously researched and applied, such as the grouting sleeve connection technology for the main reinforcement connection, the high-strength threaded steel connection technology for the prestressed reinforcement connection and the self-contained connection technology. Locking steel strand anchoring connection technology, etc. [0003] As the pier assembly prestressed connection is suitable for projects with large lateral loads and high seismic requirements, such as sea-crossing bridges, railway bridges, and urban viaducts; the various methods currently commonly used have some shortcomings; for example 1. H...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D19/02E01D19/14E01D101/28
CPCE01D21/00E01D19/02E01D19/14E01D2101/28
Inventor 苏强谢正元吴东明李旺龙
Owner LIUZHOU OVM MASCH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products