Tunnel entering and exiting construction method for slurry balance shield
A mud-water balance and construction method technology, which is applied in earthwork drilling, wellbore lining, tunnel lining, etc., to achieve the effects of reducing the risk of water penetration, ensuring safety, and improving the efficiency and effect of sealing and waterproofing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Embodiment 1: A construction method for mud-water balance shield tunneling
[0051] Such as Figure 1A-Figure 1D As shown, a mud-water balance shield tunneling construction method of the present embodiment includes the following steps:
[0052] S1, set the first reinforcement zone 1 outside the exit direction of the launch shaft 100, the length of the first reinforcement zone 1 along the tunnel axis is greater than the length of the shield machine 200; Frame 101, shield machine 200, reaction force frame 102, and open-shaped steel negative ring 108. The shield machine 200 is set on the launch frame 101, and the reaction force frame 102 can touch the shield tail of the shield machine 200 through the open-shaped steel negative ring 108. ;
[0053] S2, preset the first steel tunnel door 2 on the first side wall 104 of the originating shaft 100, chisel the first underground wall 105 along the first steel tunnel door 2 to form a hole; set the first steel tunnel door 2 inside...
Embodiment 2
[0067] Embodiment 2: A mud-water balance shield tunneling construction method
[0068] Such as Figures 6A-6D As shown, the present embodiment provides a mud-water balance shield tunneling construction method, comprising the following steps:
[0069] SS1, such as Figure 6A , the second reinforcement zone 4 is set outside the hole-entry direction of the receiving shaft 300, the receiving frame 301 is arranged in the receiving shaft 300, and the second steel door 5 is reserved at the second side wall 302 of the receiving shaft 300, the second The second steel wire brush 51 is arranged in the second steel portal 5;
[0070] SS2, the shield machine 200 advances towards the receiving shaft 300 in the second reinforcement area 4, such as Figure 6B , the cutter head 201 is excavated and the profiling knife 202 provided on the cutter head 201 over-excavates the second reinforcement zone 4; 200 Stop advancing and reduce the pressure in the front chamber;
[0071] In this step, t...