Unlock instant, AI-driven research and patent intelligence for your innovation.

BIM-based building construction method and system, computer device and storage medium

A technology of building construction and computer programs, applied in special data processing applications, geometric CAD, etc., can solve the problems of inability to clearly explain the construction progress and low efficiency of construction progress monitoring, and achieve the effect of improving accuracy and efficiency

Active Publication Date: 2021-11-16
天一建设发展有限公司
View PDF8 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Regarding the related technologies mentioned above, the description of the management personnel alone cannot clearly explain the construction progress. Therefore, the inventor believes that there is a defect of low construction progress monitoring efficiency.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based building construction method and system, computer device and storage medium
  • BIM-based building construction method and system, computer device and storage medium
  • BIM-based building construction method and system, computer device and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0059] The embodiment of the present application discloses a BIM-based building construction method. refer to figure 1 , the method includes:

[0060] S1: deploy several collection devices on the construction site, and obtain construction information on the construction site in real time based on the several collection devices, the construction information includes but not limited to construction progress information.

[0061] Specifically, in this embodiment, the acquisition device uses unmanned aerial vehicles, that is, several unmanned aerial vehicles can be deployed in various directions on the construction site, and then, the unmanned aerial vehicles are used to perform fixed-position aerial photography tracking on the construction site in real time, To collect the construction progress information of the construction site, and store the collected construction progress information for subsequent retrieval; of course, according to the actual collection situation, you can ...

Embodiment 2

[0081] refer to image 3 , is another embodiment of the present application. The difference between this embodiment and the previous embodiment is that the BIM-based building construction method may also include:

[0082] S4: Collect building construction data, create a preset construction progress model according to the building construction data, and upload the preset construction progress model to the cloud.

[0083]Specifically, in this embodiment, the collected building construction materials include but are not limited to project bidding documents, project planning documents, and construction design drawings, and, based on the collected building construction materials, Revit software is used to create a preset construction progress model, Of course, according to the actual creation situation, you can also choose to use Allplan, Tekla, PKPM-BIM, YJK-Revit and other software to create models. When the preset construction schedule model is created using Revit software, the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of building construction, in particular to a BIM-based building construction method and system, a computer device and a storage medium; the method comprises the following steps: arranging a plurality of acquisition devices at a construction site, and obtaining construction information of the construction site in real time based on the plurality of acquisition devices, the construction information including but not limited to construction progress information; creating an actual construction progress model according to the obtained construction progress information; and uploading the actual construction progress model to a cloud, wherein the actual construction progress model comprises a plurality of parameters, and the plurality of parameters comprise but are not limited to each construction stage, construction time corresponding to each construction stage, construction progress corresponding to each construction stage and the principal corresponding to each construction stage; and calling the actual construction progress model in the cloud, and displaying the actual construction progress model on a terminal. The invention has the effect of improving the construction progress monitoring efficiency and accuracy.

Description

technical field [0001] The present application relates to the field of building construction, in particular to a BIM-based building construction method, system, computer device and storage medium. Background technique [0002] BIM (Building Information Modeling) is the abbreviation of Building Information Modeling. BIM technology is a digital tool applied to engineering design and construction management. Sharing and transmission during the life cycle enables engineering and technical personnel to correctly understand and efficiently respond to various building information. [0003] The monitoring of building construction progress in related technologies is generally to organize regular meetings of management personnel, and the personnel of various departments will report their current construction progress at the meeting, as well as the situation of advance / lag, and organize them into meeting minutes at the meeting. Post-statistics and improvement of the construction organ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13
CPCG06F30/13Y04S10/50
Inventor 张磊张栋刘三强常君涛侯俊杰
Owner 天一建设发展有限公司