[0069] Embodiment 1: as the description attached Figure 1-11 A special-shaped box girder erection construction process based on the bowstring centerline positioning method is shown.
[0070] 1. Engineering background and project content
[0071] 1. Project overview
[0072] This project is a rocket skid slide rail extension line cap and rail bearing beam project for a test research institute. The extension line is 7,000 meters long and is located in a certain place in Inner Mongolia. The project includes concrete pile caps, prefabricated rail bearing beams and installation, track Pre-buried fasteners, etc.;
[0073] The site of the project is located in the remote experimental area of the base. The site is a grassland with flat terrain. The soil category of the site is Class II, and the standard freezing depth of the site is 1.0m. The main strata from top to bottom in the site are:
[0074] Fine sand ① layer, slightly dense to medium dense, distributed on the surface of...