Double-semi-directional ramp steel box girder for municipal engineering bridge construction and construction process
A technology for bridge construction and steel box girders, applied in bridges, bridge materials, bridge construction, etc., can solve the problems of heavy body weight, inconvenient installation and operation, poor shock absorption effect, etc., to reduce bending, reduce overall quality, and protect The effect of stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] For the convenience of those skilled in the art to understand, the following in conjunction with the attached Figure 1-13 , to further specifically describe the technical solution of the present invention.
[0049] A double semi-directional ramp steel box girder for municipal engineering bridge construction, including steel box girder I1, auxiliary beam I2, auxiliary beam II3, steel box girder II4, support plate 5, auxiliary support mechanism I6, shock absorbing mechanism 7, and auxiliary support Mechanism Ⅱ8, maintenance opening sealing mechanism 9; auxiliary beam Ⅰ2 is set on the side of steel box girder Ⅰ1; auxiliary beam Ⅱ3 is set on the side of steel box girder Ⅱ4; support plate 5, auxiliary support mechanism Ⅰ6, shock absorbing mechanism 7, auxiliary support Mechanism Ⅱ8 is arranged in the steel box girder Ⅱ4 in turn; the steel box girder Ⅰ1 and steel box girder Ⅱ4 have the same internal structure; the auxiliary beam Ⅰ2 has the same structure as the auxiliary bea...