Task unloading sequence prediction method, task unloading decision-making method, electronic equipment and storage medium
A technology of prediction method and decision-making method, applied in program control design, program control device, electrical digital data processing, etc., can solve the problems of not considering vehicle mobility, not considering the change of topology structure, and occupying the channel for a long time, etc. Achieve the effect of reducing complexity and convergence, optimizing execution delay, and reducing time occupancy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.
[0031] The main flaws in the related schemes are that the impact of vehicle mobility is not considered, and complex tasks cannot be satisfied by only binary offloading, and only a single-process streamline execution process is used to execute the result, resulting in the total task occupying the channel for a longer and easier time. Result failed during cooperative uninstall.
[0032] Aiming at the problem that the influence of vehicle mobility is not considered, because most of the existing optimization problems about the cooperative un...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


