Unlock instant, AI-driven research and patent intelligence for your innovation.

Two-stage robust optimization power system operation flexibility capacity evaluation method

A power system, robust optimization technology, applied in the direction of power network operating system integration, information technology support system, electrical components, etc., can solve problems such as complex scenarios, wide application of constrained stochastic optimization methods, and great difficulty, to achieve high scheduling performance , reduce conservatism, and reduce system operating costs

Pending Publication Date: 2021-12-28
ELECTRIC POWER SCI RES INST OF STATE GRID XINJIANG ELECTRIC POWER +1
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the study of flexibility, the uncertainty of renewable energy output is firstly modeled. The main modeling methods are stochastic optimization method and robust optimization method. The former stochastic optimization method describes the output of renewable energy with a deterministic probability distribution. characteristics, it has good economy in application, but it is difficult to solve and the scene is complex, which restricts the wide application of stochastic optimization method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Two-stage robust optimization power system operation flexibility capacity evaluation method
  • Two-stage robust optimization power system operation flexibility capacity evaluation method
  • Two-stage robust optimization power system operation flexibility capacity evaluation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0062] Example: as attached figure 1 As shown, the two-stage robust optimization method for power system operation flexibility capacity assessment includes the following steps:

[0063] Step 1: Construct a scheduling model with an adjustable robust interval, and set the constraints of the dispatching model with an adjustable robust interval; in this step, take the uncertainty set of wind power output as a decision At the same time, the optimal uncertainty set considering the uncertainty of wind power output is realized, and the maximum uncertainty area that can be accepted by the power system under the condition of safe and stable operation is determined through the dispatching model, that is, on the premise of ensuring the safety and stability of the power system Under the condition of maximizing the operating economy of the power system, the objective function under the condition of maximizing the operating economy of the power system is composed of three parts: minimizing t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of power system operation control methods, in particular to a two-stage robust optimization power system operation flexibility capacity evaluation method, which comprises the following steps of: constructing a scheduling model of an adjustable robust interval, and setting constraint conditions of the scheduling model of the adjustable robust interval; then improving the scheduling model of the adjustable robust interval, setting a corresponding constraint condition, finally carrying out linear conversion on the two models, and solving by adopting a CCG algorithm to obtain a feasible region and an optimal solution of the power system. The method can effectively evaluate the operation flexibility capacity of the system, and has the following advantages: (1) good economy: the method can effectively reduce the operation cost of the system, reduce the conservative property of the scheduling decision, and further improve the flexibility and economy of the scheduling decision of the system; and (2) high scheduling performance: the flexibility of pre-scheduling of the system reserve capacity is evaluated through wind curtailment and load shedding, and the flexibility of system operation scheduling is effectively improved.

Description

technical field [0001] The invention relates to the technical field of power system operation control methods, and relates to a two-stage robust optimization power system operation flexibility capacity evaluation method. Background technique [0002] In order to reduce greenhouse gas emissions and achieve sustainable development, the use of renewable energy, such as wind and light, as a non-polluting and clean energy, has been vigorously promoted around the world. The dual-carbon target proposed by China requires large-scale renewable energy. Energy participation can only be achieved. The grid connection of highly intermittent renewable energy has led to the transformation of the power system from a deterministic system to a strongly uncertain system. This transformation has led to new challenges in the operation of the power system. Slope and system backup requirements, improving system operation flexibility has become a current research hotspot. In the study of flexibili...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02J3/46H02J3/14
CPCH02J3/466H02J3/144H02J2203/10H02J2203/20Y02B70/3225Y04S20/222
Inventor 唐君毅董雪涛秦艳辉李德存南东亮刘震孙冰朱子民段青熙段玉王小云祁晓笑张媛杨琪彭寅章
Owner ELECTRIC POWER SCI RES INST OF STATE GRID XINJIANG ELECTRIC POWER