Improved double-side-wall pilot tunnel method for giving consideration to TBM empty pushing station crossing in advance in arch structure
A technology of double-sided guide pit and passing station, which is applied in wellbore lining, tunnel lining, underground chamber, etc., can solve problems such as mutual interference, and achieve the effect of improving assembly rate, continuous excavation, and shortening the required time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Embodiment 1: as figure 1 As shown, an improved double-side-wall pilot pit method that takes into account the TBM’s air-push passing through the station first, where the excavation sequence of the subway station is first divided into sides and then layered, and the excavation section is double-layered and six-guided. Pit form, specifically including the following construction steps:
[0033] S1, first excavate the rock mass of the pilot pit 1 on the left side of the arch, and correspondingly construct the initial support 7 of the arch of the pilot pit, the temporary steel vertical brace 8 on the upper part, and the temporary steel cross brace 9 at the bottom of the pilot pit; reserve two lining arch covers 13 and the load-bearing rock foundation of the bottom longitudinal beam 14; wherein: the temporary steel cross brace 9 is used as the temporary closed inverted arch structure of the pilot pit 1 on the left side of the arch;
[0034] S2, the face of pilot pit 1 on the l...