Anti-settling and anti-sliding bridge cone slope construction method
A construction method and anti-slip technology, used in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problem of insufficient rolling treatment of the contact surface between the bridge abutment and the cone slope, the small volume of the soil cone slope, and the problem of the cone slope. Settlement deformation and other problems to achieve the effect of increasing the service life, resisting slip damage and improving the integrity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0022] A kind of anti-settlement and anti-slip bridge cone slope construction method, such as figure 1 and figure 2 Said, including the steps: S1, when pouring the abutment 3, distribute the pre-embedded tie rods 1 along the vertical and horizontal directions, and perform anti-corrosion treatment on the exposed ends of the tie rods 1; S2, lay a layer of backfill soil 7 with a certain thickness and roll it compactly, The area near the abutment 3 is tamped manually or with small equipment, and the area near the embankment slope 6 is processed by digging steps, so that the entire soil body is fully compacted; S3. Lay flexible connecting ribs 2 on the top surface of the backfill soil 7 1. Install the slope panel 4 of the current layer on the outer side, connect one end of the connecting rib 2 with the pull bar 1, and connect the other end with the slope p...