Pre-burying construction method for wall attaching and connecting piece of tower crane
A construction method and a technology for connecting wall parts, which are applied in construction, cranes, building structures, etc., can solve the problems of inability to use turnaround, hollow outer wall decoration, large size deviation, etc., to save costs, improve construction speed, and improve The effect of construction quality and precision
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] A pre-embedded construction method of a tower crane attached to a wall and connected to a wall provided by the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer in conjunction with the following description. It should be noted that all the drawings are in a very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.
[0022] Such as figure 1 As shown, the wall attachment 10 provided by this embodiment includes a vertical plate 11 and a horizontal plate 12, one end of the horizontal plate 12 is fixedly connected to one side of the vertical plate 11, and the vertical plate 11 is provided with Bolt hole one 13, said horizontal plate 12 is provided with bolt hole two 14, bolt hole two is used for installing tower c...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


