Construction method for opening of contact channel of existing shield tunnel
A construction method and communication channel technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as inadequacies, achieve the effects of shortening the processing period, ensuring safety and quality, and ensuring the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] Embodiment 1: as Figure 1-16 As shown, a construction method for the opening of the connecting channel of the existing shield tunnel is as follows: firstly, the segment support and reinforcement device is used to complete the segment support reinforcement in the opening area and the affected area, and the advanced system grouting treatment is performed to achieve After the expected effect, adopt the three-pilot three-step construction method to construct the segment opening: first excavate the middle pilot tunnel, construct the middle pilot tunnel interface ring beam and column, and temporary steel support; then construct the left pilot tunnel and close the left ring beam ;Finally construct the right pilot tunnel and close the right ring beam, and remove the temporary support after the ring beam is closed and reaches the design strength; The segments are all broken in the shield tunnel and excavated outward; the internal support of the segment adopts the method of "rai...
Embodiment 2
[0120] Embodiment 2: as Figure 17-19 shown, for figure 1 The existing annular segment 1, the tunnel bottom backfill 2 installed at the bottom of the annular segment, the track 3 installed on the tunnel bottom backfill 2, the platform slab 26, the platform slab bottom side wall 4 and the rail top beam structure 5 In the existing structure, the rail top beam structure 5 is directly opposite to the track 3 and the track slab is arranged. The segment support and reinforcement device designed by the present invention includes a temporary concrete structure plate 6 on the rail top, a temporary concrete bottom longitudinal beam 7, a column 9, and a column 2 12 , column three 16, steel wedges 17 and circular arc-shaped I-steel 22, the temporary concrete bottom longitudinal beam 7 is arranged on the inner side of the bottom of the access passage opening 26, and the lower ends of a plurality of column one 9 and a plurality of column two 12 are respectively longitudinally spaced and fix...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com