Unlock instant, AI-driven research and patent intelligence for your innovation.

Complex project digital construction and installation method based on BIM (Building Information Modeling)

An installation method and engineering technology, applied in data processing applications, design optimization/simulation, special data processing applications, etc., can solve the problems of difficult construction, waste of construction materials, supervision and update, etc., to improve the convenience of preparation and reduce Construction time and the effect of improving construction efficiency

Pending Publication Date: 2022-05-27
HUANGHUAI UNIV +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. The existing complex engineering construction management is complicated, the management requirements are high, and the coordination management and control are difficult; the management objects are complex, and coordination management cannot be achieved;
[0004] 2. The existing digital construction of complex projects cannot model the building in 3D, which makes the construction difficult, and the drawings have large errors, which easily leads to construction defects and waste of construction materials;
[0005] 3. Secondly, the existing construction progress cannot be well supervised and updated, resulting in information blockage and the inability to understand the construction situation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Complex project digital construction and installation method based on BIM (Building Information Modeling)
  • Complex project digital construction and installation method based on BIM (Building Information Modeling)
  • Complex project digital construction and installation method based on BIM (Building Information Modeling)

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0046] see figure 1 , A BIM-based digital construction and installation method for complex projects, including construction implementation, construction implementation including scheme reservation, BIM modeling, construction management, industrial processing, construction and installation, information management and accurate detection, involving an installation method including the following steps :

[0047] S1: The general design te...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a BIM (Building Information Modeling)-based complex project digital construction and installation method, belongs to the technical field of complex project digital construction, and aims to solve the problems that the existing complex project construction is complex in project construction management, high in management requirement and high in coordination management and control difficulty; management objects are complex, coordinated management cannot be achieved, and three-dimensional modeling cannot be conducted on a building, so that the construction difficulty is large, and drawing errors are large; the construction progress cannot be well supervised and updated, and the construction condition cannot be known. Budget estimation is carried out through each single construction module, a plurality of single budgets are summed up, whole project estimation is completed, informatization management can be carried out, progress information is set in the information sharing system, construction management and control personnel carry out settlement on daily construction and input the information, multi-party information intercommunication is achieved, and the construction management and control system is convenient to use. The construction progress can be known, the overall appearance of the building can be clearly known in advance through three-dimensional modeling, details can be pushed more conveniently, and the construction difficulty is reduced.

Description

technical field [0001] The invention relates to the technical field of complex engineering digital construction, in particular to a BIM-based digital construction and installation method for complex projects. Background technique [0002] In recent years, my country's steel structure construction technology and digital technology have developed rapidly. However, the systematic research on digital construction technology that combines digitalization and construction and breaks the barriers of professional and industrial upstream and downstream is lagging behind. How to ensure the installation accuracy and architectural effect of complex and huge steel structures in complex projects, it is necessary to establish a high-precision measurement control network and high-precision measurement and control for component assembly and installation, especially to obtain the interface configuration of the installed components in real time to guide Ground assembly and high-altitude install...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06F30/20G06Q50/08
CPCG06F30/13G06F30/20G06Q50/08
Inventor 李勇王昌盛贺子光董润润赵辉
Owner HUANGHUAI UNIV