Damping and buffering method and device during blasting construction of mine roadway
A buffer device and roadway technology, which is applied in the field of mine shaft engineering, can solve the problems of lack of support strength, long pouring period, large disturbance of surrounding rock, etc., and achieve the effect of highlighting practical significance, fast construction period, and reducing construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
like figure 1 and figure 2 As shown in the figure, the shock absorption and buffer device during blasting construction of mine roadway according to the present invention includes an upward roadway 1 and an existing roadway 5, a buffer device is installed at the bottom of the upward roadway 1, and a shock isolation arc surface 6 is installed on the top of the existing roadway 5, The vibration effect generated by the blasting point of the upward roadway 1 is transmitted to the existing roadway 5 through the buffer device and the shock isolating arc surface 6, wherein:
The buffer device includes a buffer prefabricated plate 4, a shock-absorbing pad 3 and a reinforced tower plate 2. The buffer prefabricated plate 4 is firmly connected to the foundation at the bottom of the upward roadway 1 by secondary pouring with cement. The shock-absorbing pad 3 includes an anti-skid pad at the bottom. 32. The sealing pad 31 arranged on the edge of the anti-skid pad 32 and the height-adjustin...
Embodiment 2
The specific shock-absorbing and buffering method is given in this embodiment 2.
[0028] like image 3 As shown, the method for shock absorption and buffer device during blasting construction of mine roadway according to the present invention includes the following steps:
S1: Setting of the buffer device: According to the design of the construction organization, a buffer device is laid for the buffer device in the short-range blasting affected area, namely:
S11: Since the space occupied by the buffer prefabricated plate 4 needs to be excavated, the intermediate interlayer surrounding rock needs to be over-excavated. After the leveling treatment, the buffer prefabricated plate 4 is lifted by a tool through the lifting mechanism and dropped into the foundation of the upward roadway 1;
S12: Load the anti-skid pads 32 and the height-adjusting pads 33 on the buffer prefabricated plate 4, lift the reinforcement tray 2 by the lifting mechanism, and drop it onto the buffer prefabr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com