Masonry arch bridge rapid forcible entry method capable of releasing bridge deck constraint
A masonry arch bridge and demolition technology, applied to bridges, bridge maintenance, bridge construction, etc., can solve the problems of extended construction period, high cost, heavy workload, etc., and achieve the effects of short demolition period, small vibration and less dust
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0064] A rapid dismantling method for a masonry arch bridge for releasing bridge deck constraints, comprising the following steps:
[0065] Step 1: Collect or actually measure the structural parameters of the masonry arch bridge to be demolished, and obtain the span, sag height, deck pavement thickness, width, and reinforcement arrangement;
[0066] Step 2: Calculate the critical values m', h' and k' of the number of steel bars, thickness and width of the deck pavement of the masonry arch bridge to be demolished by the critical formula pz ;
[0067] The critical formula is:
[0068]
[0069]
[0070]
[0071] Among them, m is the number of steel bars paved on the deck of the masonry arch bridge to be demolished, m' is the critical value of the number of steel bars paved on the deck of the masonry arch bridge to be demolished, and h is the masonry to be demolished. The thickness value of the deck pavement of the arch bridge, h' is the critical value of the thicknes...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com