A technology of soft coal seam and construction method, which is applied in the direction of tunneling, earthwork drilling and installation of bolts, etc., can solve the problems that the stability and safety of the roadway cannot be guaranteed, and achieve the effect of simple construction and guaranteed stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] An embodiment of the present invention, such as Figure 1 to Figure 5 As shown in the figure, a high-top cooperative anchoring structure for a roadway with a large inclination angle of soft coal seam is disclosed, which includes a 7-type pallet 2, a first anchor cable 1 and a guard beam 4. The 7-type pallet 2 is anchored, and the guard beam 4 is installed along the high-top and locked with the 7-type pallet 2 to support the high-top coal body of the roadway.
[0038] The cooperative anchoring structure of this embodiment uses the first anchor cable and the guard beam 4 to perform cooperative anchoring. On the one hand, the guard beam 4 and the steel wire mesh limit the deformation and damage of the soft coal body and the fins, and on the other hand, through the first anchor beam 4 and the steel wire mesh An anchor cable and a 7-type pallet lock the guard beam 4 to a relatively deep stable rock mass. When the high-cut coal body produces a greater pressure on the guard be...
Embodiment 2
[0084] An embodiment of the present invention discloses a method for constructing a high-top collaborative anchoring structure for a roadway with a large inclination angle in a loose and soft coal seam according to Embodiment 1, which includes the following steps:
[0085] Step 1: When the roadway is excavated, according to the inclination of the coal seam, the roadway is driven along the roof of the coal seam, and along the roadway excavation direction, the high side of the roadway is composed of the coal body side and the rock body side, and the roadway is not broken during the tunneling.
[0086] like figure 1 As shown, set the vertical height of the coal body of the roadway to be h 1 , the vertical height of the rock mass is h 2 , the height of the support beam 4 is h 3 , then the vertical height of the high top h=h 1 +h 2 . Set the dip angle of the coal seam as θ 1 , then the angle between the coal seam and the vertical line θ=90°-θ 1 .
[0087] Step 2: After the ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Length | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 