Steel-concrete combined section of cable-stayed bridge and ultra-large area grouting construction method of steel-concrete combined section
A technology with super large area and construction method, applied in cable-stayed bridges, bridges, bridge materials, etc., can solve the problems of low construction efficiency, poor grouting effect, complex structure, etc., and achieve the effect of ensuring grouting quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Embodiment 1: In order to solve the construction method of super large area grouting in the steel-concrete joint section of the cable-stayed bridge in the prior art, the construction process is relatively complicated, the construction efficiency is low, and the grouting effect is not good when the top surface of the tower has no slope. technical problem. The present embodiment provides a super-large area grouting construction method for a steel-concrete joint section of a cable-stayed bridge, comprising the following steps:
[0038] Step 1) Chisel slot 1;
[0039] Step 2) Setting the partition wall 2;
[0040] Step 3) Set the pad 3;
[0041] Step 4) install the first segment steel tower;
[0042] Step 5) Grout the bearing plate 4.
[0043] The super-large-area grouting construction method for the steel-concrete joint section of the cable-stayed bridge provided by the present invention is that the tower base concrete is reserved around the top surface of the tower ba...
Embodiment 2
[0044] Embodiment 2: On the basis of Embodiment 1, this embodiment provides a super-large area grouting construction method for the steel-concrete joint section of a cable-stayed bridge. Step 1) The specific process of chiseling the slot 1 is as follows: The tower base is poured to the top surface of the grouting layer 5. After pouring, the top surface of the tower base can be formed into a plane, which has a wide range of applications and does not require high flatness on the top surface of the tower base. Leave 25-35cm thick concrete of the tower base, and cut off the rest of the top surface of the tower base by chiseling to form a notch 1 with a depth of 5-10cm.
[0045] The chisel slot 1 is to pour the tower base to the top surface of the grouting layer 5 during the construction of the tower base, and then chisel the overcast concrete by chiseling to form a slot 1 with a depth of 5cm. In order to ensure the top of the tower base Surface flatness and grouting quality, durin...
Embodiment 3
[0046] Embodiment 3: On the basis of Embodiment 1, the present embodiment provides a super-large area grouting construction method for the steel-concrete joint section of a cable-stayed bridge. Step 2) The process of setting the partition wall 2 is as follows: The notch 1 is divided into a plurality of grouting areas of equal area by the partition wall 2.
[0047] The present invention is aimed at the grouting area greater than 270m 2 , In order to avoid the problem of insufficient grouting in the super-large grouting area, the super-large grouting area is divided into equal areas by setting partition 2, and then grouting is performed. Only a small area needs to be grouted each time, which can not only ensure the grouting quality, but also improve the grouting efficiency.