Well pressure control system
Patent Information
- Authority / Receiving Office
- US · United States
- Current Assignee / Owner
- EXPRO AMERICAS
- Publication Date
- 2005-05-05
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application claims priority to pending U.S. Patent Application Serial No. 60 / 515,875 (Attorney Docket Number PC-P007V, filed Oct. 30, 2003 by John McCaskill, et al. and entitled “Hydraulic Choke Control System for Underbalanced Drilling.”FIELD OF THE INVENTION
[0002] The present invention relates to an apparatus for maintaining well pressure control in various situations such as underbalanced, overbalanced, or other managed pressure drilling of petroleum wells, or the control of petroleum wells that are out of control or likely to become out of control. More particularly, the present invention relates to the operation of hydraulic choke valves for the maintenance of a constant drilling fluid pressure on the downhole formation face despite fluctuations arising due to mud pump speed changes or other causes. DESCRIPTION OF THE RELATED ART
[0003] Hydraulic choke devices are commonly used in the oilfield when drilling wells for oil or n...