Jackstone-type rockfill concrete construction method
A technology of rockfill concrete and construction methods, which is applied in the direction of infrastructure engineering, dams, building structures, etc., can solve problems such as slow construction speed, complicated construction procedures, and large construction quality due to human interference, so as to improve construction speed and simplify construction. Construction procedure, effect of easy cycle construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0016] The present invention is based on the prior art, pouring self-compacting concrete into the bin first, and then throwing stones or pebbles of various particle sizes into the self-compacting concrete, and the blocks or pebbles are placed in the self-compacting concrete under the action of self-weight Settling and accumulating in the middle, finally forming a complete and dense rockfill concrete. The specific implementation method can be implemented in the following steps:
[0017] 1) Set formwork or substitutes 1 for the warehouse surface where rockfill concrete needs to be poured. The formwork substitutes can be closed structures such as masonry walls or concrete walls with certain rigidity and strength. The warehouse surface with natural barriers does not need to be provided with formwork or Alternatives: Formwork may not be set for the warehouse surface that already has barriers, and closed structures such as masonry walls or concrete walls may also be used instead of ...
specific Embodiment
[0025] In the specific implementation, the particle size of the used rockfill ranges from 4cm to 80cm. There are both block stones and pebbles in the rockfill. The particle size distribution is not uniform. Self-compacting concrete can be poured into the silo by pumping, laundering, free fall, etc. After pouring about 1m of self-compacting concrete, use dump trucks, bulldozers, excavators, etc. Throw evenly into the self-compacting concrete until the self-compacting concrete is filled; then continue to pour self-compacting concrete, and then throw stones to realize cycle construction. Self-compacting concrete with a slump of 240-260mm, expansion of 450-650mm, and a V-shaped funnel passing time of 20s-50s is used for pouring. The pouring method adopts pumping into the warehouse, hanging tank into the warehouse, and slipping There are various forms such as warehousing, backhoe warehousing and so on. The formed rock-fill concrete was tested by cutting observation, core drilling,...
PUM
Property | Measurement | Unit |
---|---|---|
slump | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com