Deceleration and antiskid marked line suitable for entrance and exit sections of tunnel
A deceleration marking, import and export technology, applied in tunnels, mining equipment, earthwork drilling and mining, etc., to achieve the effects of good environmental protection, low environmental pollution, and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as figure 1 , figure 2 , image 3 , Figure 4 and Figure 5 As shown, the present invention includes a section of continuous longitudinal anti-skid markings 2 respectively arranged at the tunnel entrance 1 and tunnel exit 7 along the driving direction, and multi-lane laterally spaced deceleration markings arranged along the driving direction on the section outside the tunnel entrance. 3 and the multi-lane deceleration markings 3 arranged at intervals in the tunnel exit along the driving direction. The length of the anti-slip marking line 2 is 30-50m and it extends from the outside of the cave to the inside of the cave. The distance between the anti-slip marking line 2 and the adjacent deceleration marking line 3 is 4-15m. The length of the road section where the deceleration marking line 3 is laid on the road section at the exit of the tunnel is 40-250m.
[0032] combine Image 6 , the anti-slip marking line 2 includes a resin-based adhesive bottom layer 2-1...
Embodiment 2
[0036] Such as Figure 7 As shown, in this embodiment, the difference from Embodiment 1 is that a plurality of deceleration markings 3 distributed laterally at intervals are also arranged on the tunnel entrance section inside the tunnel entrance 1 along the driving direction, and the tunnel exit 7. There are also multiple deceleration markings 3 distributed laterally at intervals on the outer section of the tunnel exit, and the length of the section where the deceleration marking 3 is laid on the section inside the tunnel entrance and the section outside the exit of the tunnel is 40-250m. . In this embodiment, the section length of the deceleration marking 3 laid on the section outside the tunnel entrance and the section outside the tunnel exit is 200 ± 50m, and the section inside the tunnel entrance and the section inside the tunnel exit is laid with deceleration markings The length of the road section 3 is 40-60m; the distance between the adjacent two groups of deceleration...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com