Accurate positioning method for cable-stayed bridge pylon cable guide pipe

A cable-stayed bridge tower and precise positioning technology, which is applied to bridges, bridge parts, bridge construction, etc., can solve the problems that affect the construction progress, narrow construction space, and increased construction time of tower columns, so as to shorten the construction period and achieve high positioning accuracy , the effect of quick installation

Active Publication Date: 2011-05-04
CHINA COMM ROAD & BRIDGE NORTH CHINA ENG +1
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since tower column construction is a high-altitude operation, the construction space is narrow, especially for leaning tower columns, and it is very difficult to locate on the cable guide tower. The pressure of the conduit and other embedded parts affects each other, which directly increases the difficulty of precise positioning of the cable conduit. In addition, cutting and adjusting the cable conduit during the construction of the tower column will also increase the construction time of the tower column and affect the construction progress.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Accurate positioning method for cable-stayed bridge pylon cable guide pipe
  • Accurate positioning method for cable-stayed bridge pylon cable guide pipe
  • Accurate positioning method for cable-stayed bridge pylon cable guide pipe

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The present invention pre-processes a steel inner mold in the factory. like figure 2 As shown, the steel inner mold 3 is a quadrangular cylinder structure, and one side of the steel inner mold is bent into the cylinder to form a cable guide installation plate 31 in the cylinder. The cable guide installation plate 31 A cable conduit installation hole 32 is provided on the upper surface, a cable conduit positioning block 33 is arranged around the cable conduit mounting hole 32, and a cable conduit positioning support 34 is arranged below the cable conduit mounting plate 31 and on the outer wall of the steel inner mold cylinder.

[0017] When processing the cable conduit mounting holes 32 on the inner steel mold, the anchor points of the cable conduits are first set out on the cable conduit mounting plate 31, and holes are formed on the cable conduit mounting plate according to the anchor points to form the cable conduit mounting holes 32. .

[0018] After the installat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an accurate positioning method for a cable-stayed bridge pylon cable guide pipe, which comprises the following steps of: processing a steel inner die firstly and carrying out trial assembly on a cable guide pipe on the processed steel inner die; after the cable guide pipe reaches preset installation accuracy, calibrating the installation position of the cable guide pipe on the steel inner die and then disassembling the cable guide pipe; when a pylon cable area is constructed, lifting and fixing the steel inner die in place; and then mounting the cable guide pipe on the fixed steel inner die according to the position calibrated during trial assembly and welding and fixing the cable guide pipe. The invention converts the air positioning of a complicated cable guide pipe pylon into land factory positioning, can ensure the positioning accuracy of the cable guide pipe, simplifies the working procedure and shortens the construction period.

Description

technical field [0001] The invention relates to a method for installing a bridge cable duct, in particular to a precise positioning method for a cable duct of a tower column of a cable-stayed bridge, which can improve the positioning accuracy of the cable duct and shorten the construction period. Background technique [0002] The cable-stayed cable is the load-bearing system of the main beam of the cable-stayed bridge. See figure 1 As shown, the stay cable is guided out by a cable conduit 2 embedded in the reinforced concrete tower column 1, and the cable conduit 2 consists of a steel casing 21 and a steel casing 21 fixed at one end of the steel casing and perpendicular to the steel casing. The anchor plate 22 is formed. During the construction of the tower column 1, the positioning accuracy of the cable guide 2 is extremely high, because the positioning accuracy of the cable guide determines the construction quality of the stay cable and directly affects the stress of the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00E01D19/16
Inventor 阎王虎应虹李勇田连民王俊伟顼春江檀兴华樊俊丽
Owner CHINA COMM ROAD & BRIDGE NORTH CHINA ENG
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More