Method for measuring three-phase flow rate of producing wellhead oil transportation pipeline and daily fluid production rate of single well
A technology for oil pipelines and oil production wells, which is applied in the field of three-phase flow flow measurement of oil production wellhead oil pipelines and single well daily liquid production. It solves the problems of large volume and other problems, and achieves the effect of solving practical worldwide problems, reasonable and effective distribution of oil pipelines, and convenient testing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] The three-phase flow rate of the wellhead oil pipeline of the oil production well and the daily liquid production of a single well are measured. Before the working conditions of the oil production well in operation are changed, the tensile force, torque, active power, and liquid surface value of the liquid level sensor are measured. The oil production well in normal operation According to the following methods to change the operating conditions, (1) shut down the oil production well, (2) frequency conversion of the oil production well, (3) adjust the parameters of the oil production well, (4) inject the production liquid in the oil production well tubing into the ring sleeve (tubing and casing between); after changing the working condition, the oil production well continues to operate under the working condition for a period of time t, and then returns to the working condition before the change; measure the tension, torque, active power, and liquid level sensor after the ...
Embodiment 2
[0030] The three-phase flow rate of the wellhead oil pipeline of the oil production well and the daily liquid production of a single well are measured. The oil production well in normal operation measures the tension, torque, active power, and liquid level value of the annulus of the liquid level sensor, and changes the operating condition according to the following method. After changing the working condition, the oil production well continues to operate under the working condition for a period of time t, and then returns to the working condition before the change.
[0031] (1) Shutdown of production well
[0032] The oil production wells in normal operation are stopped, and the operating conditions of the oil production wells are changed to change the liquid level in the annulus.
[0033] (2) Frequency conversion of oil production wells
[0034] For oil production wells in normal operation, the frequency converter is used to increase or decrease the operating frequency to c...
Embodiment 3
[0042]The screw pump well variable parameter metering and diagnosis device used for the measurement of the three-phase flow rate of the oil pipeline at the wellhead of the oil production well and the daily liquid production of a single well is composed of a power supply 1, and the power supply 1 is connected to the circuit breaker 2P2 and the circuit breaker 3P5 respectively. The circuit breaker 3P5 is connected to the transmitter 7 through the transformer 8, the transmitter 7 is connected to the single-chip microcomputer 14, the single-chip microcomputer 14 is connected to the 24V relay 3, and the 24V relay 3 is connected to the AC contactor KM210. The AC contactor KM210 is connected to the thermal relay JR11 with power; the circuit breaker 2P2 is connected to the filter EMI4, the filter EMI4 is connected to the single-chip microcomputer 14, the single-chip microcomputer 14 is connected to the 220V relay 9, and the 220V The relay 9 is connected to the frequency converter 12, a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 