Well wall protective agent of gas drilling well stratum under water yielding condition
A technology of formation water production and gas drilling, which is applied in the directions of drilling composition, chemical instruments and methods, etc., can solve the problem of no on-site experiments, etc., and achieve the effect of prolonging the collapse period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0008] The present invention will be further described below in conjunction with embodiment:
[0009] The protective agent preparation method used in the following experiments is as follows (mass percentage): potassium trimethylsiliconate 30%, hydrolyzed polyacrylonitrile sodium salt 5%, sodium silicate (Na 3 SiO 4 ) 8% and water 57% mixed in the system.
[0010] 1. Evaluation experiment of film-forming property of real-time film-forming protective agent for well wall:
[0011] The real-time film-forming protective agent for the borehole wall was used in the laboratory to use Denglouku Formation mud shale and medium-permeability sandstone as experimental objects to evaluate its film-forming protective effect. After the rock sample was protected by the protective agent for 30 minutes, it was soaked in water for 72 hours. The experimental results showed that the real-time film-forming protective agent on the borehole wall can penetrate into the rock sample no matter on the sur...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com