Construction method for TBM synchronization lining

A construction method and lining technology, which are used in wellbore lining, tunnel lining, earthwork drilling, etc., can solve the problems of long construction period, many transportation locomotives, and inability to meet transportation requirements, and achieve the effect of reducing the impact.

Inactive Publication Date: 2010-12-29
ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP
View PDF0 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

(1) The tunneling is completed first and then the lining is carried out, and the construction period requires a long time
(2) The synchronous lining under locomotive mucking is used. Because one transportation track is required for lining, the transportation in the trolley section becomes a single line. In addition, locomotives are used for mucking, and there are many transport locomotives, which cannot meet the needs of rapid excavation. shipping requirements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for TBM synchronization lining
  • Construction method for TBM synchronization lining
  • Construction method for TBM synchronization lining

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method for performing TBM synchronization lining by using a TBM synchronization lining formwork jumbo and a rack. One cycle of the method comprises the following steps of: sidewall foundation concrete construction; paving of rails for the jumbo and the rack; forward movement of a front working rack; construction of a water-proof system; positioning of the simultaneous lining formwork jumbo; and forward movement of a rear working rack. The construction method for the TBM synchronization lining of the invention not only guarantees that the synchronization lining is not disturbed by mucking of a belt conveyor but also reduces the influence of muck transportation on the advance rate and the transportation of other materials.

Description

technical field The invention relates to a TBM synchronous lining construction method. Background technique The total length of the West Qinling Extra-Long Tunnel is 28,236m, and its length is currently in the forefront in China. The total length of its TBM excavation is 15,520m, which is the longest TBM construction tunnel in the domestic railway industry. The geological conditions of the tunnel are quite complicated, and it needs to pass through the high-stress phyllite strata and water-rich areas. The φ10.2m TBM and the drill-and-blast method are used for joint construction, and the project scale is large. TBM construction in foreign countries started earlier, and since the 1990s in my country, the hydropower department began to introduce foreign advanced TBMs for hydraulic tunnel construction. There are few research materials, especially the synchronous lining technology during excavation. Generally, the lining is performed after the excavation is completed. In China, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D11/10E21D11/38E21D9/12
Inventor 崔原夏安琳赵华谭顺辉李建伟张学军张宁川刘宏陈大军戴润军李玉军刘俊成许金林郑孝福董书滨杨青玉严永德杨永强强生龙吴建林成文斌王艳波
Owner ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP
Features
  • Generate Ideas
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More