Ground marking method for eliminating time drift of crystal oscillator
A technology of time drift and marking method, which is applied in seismology, geophysical measurement, electric/magnetic exploration, etc., and can solve problems that cannot meet the requirements of portability, low power consumption and low cost, accuracy of defect location, and difficulty of algorithms, etc. problem, to achieve the effect of eliminating crystal oscillator time drift, low power consumption and cost, and eliminating influence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] In order to make the object, technical solution and advantages of the present invention clearer, the implementation manner of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0033] In order to eliminate the influence of clock drift on the measurement results, improve the detection accuracy of ground markers, accurately locate the position of pipeline defects, and meet the requirements of portability, low power consumption and low cost, the embodiment of the present invention provides a method to eliminate crystal oscillator time Drift ground marking method, see figure 2 , image 3 , Figure 4 , Figure 5 and Figure 6 , see the description below:
[0034] The embodiment of the present invention is based on an existing ground marking system using a highly stable clock source synchronization method for time synchronization. The ground marking system includes two parts: a ground marker and a master clock...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 