Method for recovering inter-domain failure of cross-domain label switched path
A technology of label switching path and recovery method, which is applied in the direction of data switching network, digital transmission system, electrical components, etc., and can solve problems such as resource conflicts, long calculation time, conflicts, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0047] In this embodiment, as an improvement of the present invention:
[0048] In step (2), the path calculation unit PCE(i) of the domain D(i) is set with a forward recovery threshold Hf and a reverse recovery threshold Hb; the virtual recovery path tree VRPT(i) of the domain D(i) fails to calculate When the path calculation unit PCE(i) forwards the LSP cross-domain recovery request message to the path calculation unit PCE(i+1) of the domain D(i+1), it also contains the forward recovery threshold Hf; virtual recovery path The tree VRPT(i) is successfully calculated, and the path calculation unit PCE(i) reversely sends to the path calculation unit PCE(i-1) of the domain D(i-1). The LSP cross-domain recovery request message also contains the reverse recovery threshold Hb ;
[0049] In step (3), after the path calculation unit PCE(i+1) of the domain D(i+1) receives the LSP cross-domain recovery request message sent by the path calculation unit PCE(i) of the domain D(i), Check whet...
example 1
[0066] Assuming that node 13 fails, it is obviously not feasible to restore the failed cross-domain label switching path LSP in domain D(3), and cross-domain restoration of this failed cross-domain label switching path LSP is required. The process of cross-domain recovery efficiency cross-domain label switching path LSP is as follows Figure 7 As shown, the specific steps are as follows:
[0067] (1) The path calculation unit PCE(3) sets the recovery threshold, for example, sets the forward recovery threshold Hf=1 and the reverse recovery threshold Hb=2. The path calculation unit PCE(3) separately calculates the shortest path from all the entry boundary nodes to the path exit boundary node BNex(3) after the domain D(3) excludes the failed node 13. In this example, the entry boundary node of domain D(3) is node 12 after excluding the failed node 13, and a node 12 to the path exit boundary node BNex(3) is obtained, that is, the virtual restoration path tree VRPT(3) of node 17, The...
example 2
[0074] In this failure scenario of Example 1, only the reverse recovery threshold Hf is required, and a scenario in which the forward recovery threshold Hb is required is used to illustrate the recovery method of the present invention.
[0075] Such as Figure 8 As shown, assuming that node 17 fails, it is obviously not feasible to restore the failed cross-domain label switching path LSP in domain D(3), and cross-domain recovery is required. The specific steps are as follows:
[0076] (1) The path calculation unit PCE (3) sets the recovery threshold: the forward recovery threshold Hf=1, and the reverse recovery threshold Hb=2. After the path calculation unit PCE(3) excludes the failed node 17, it calculates the virtual restoration path VSPT(3). In this topology, since the failed node 17 is the path exit boundary node of the domain D(3), there is no path from the entry boundary node to the path exit boundary node BNex(3) in the domain D(3), that is, the path of the failed node 17, v...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 