A construction method and drainage pipe technology, which are applied in the field of construction engineering, can solve problems such as large ground subsidence, large soil disturbance, affecting pipelines, road traffic, and ground building safety, and achieve significant social benefits and fast construction progress. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0029] The construction steps of this embodiment include:
[0030] (1) Measurement and setting-out
[0031] Arrange temporary benchmarking points and pipeline axis control piles, and set up central piles at intervals of 20m during construction setting-out, and set central piles at inspection wells.
[0032] (2) Construction of working well
[0033] Install reinforced concrete prefabricated slabs in the slots reserved at the top of the working well, and the slots must be filled with grout. Build a brick wall at the reserved opening of the prefabricated slab. All bricks should be soaked in water. During the masonry, they should be fully paved and crowded, and built up and down. The thickness of the horizontal mortar joints and the width of the vertical mortar joints should be uniform, and there should be no vertical joints . When building inspection wells, steps should be installed synchronously, and the positions should be accurate. After the steps are installed, the steps s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com