Newly-built top pipe well and old pipe well connecting construction method

A construction method and pipe jacking technology, which can be used in construction, artificial islands, water conservancy projects, etc., can solve the problems of high consumption of manpower and material resources, long construction period, and large amount of excavated soil, and achieve labor saving, short construction period, and ground traffic. small effect

Active Publication Date: 2014-10-22
SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This process has a large amount of excavated soil, a long construction period, a lot of manpow

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0017] The present invention is further illustrated by specific examples below.

[0018] A construction method for connecting a newly-built pipe jacking well and an old pipe well; it includes connecting steel pipes, and further includes the following steps:

[0019] Step 1. Construct a new pipe jacking well structure, and reserve connection steel pipe installation ports according to design requirements;

[0020] Step 2. Use high-pressure jet grouting piles and compaction grouting to reinforce both sides of the interface area where the old tube well and the new tube well are connected to the connecting pipeline; around the interface between the tube well and the connecting steel pipe, use ordinary Portland cement and water glass mixed slurry through injection The grout pipe performs layered grouting reinforcement on the soil;

[0021] Step 3. After all the construction of the new pipe jacking and pipe jacking well structure is completed, cut the retaining structure to 70% of the outer ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the field of underground pipeline construction, in particular to a newly-built top pipe well and old pipe well connecting construction method. The method includes that a connecting steel pipe is arranged. The method is characterized by including the following steps: constructing structure of a newly-built top pipe well, and reserving a connecting steel pipe mounting port according to design requirements; reinforcing two sides of port areas where an old pipe well and the newly-built pipe well are connected with a connecting pipeline and four sides of ports where the pipe wells are connected with the connecting steel pipe, chiseling to remove a retaining structure to 70% of the outer wall of the old well according to size of a reserved hole of the newly-built top pipe well after construction of a new top pipe and the top pipe well structure is completed fully, and connecting the connecting steel pipe with the new pipe well and the old pipe well according to the design requirements; pouring concrete in the outer layer of the connecting steel pipe; connecting the connecting steel pipe into the old well, and cutting well walls underwater at a connecting hole mark until the connecting steel pipe is completely communicated with the new well and the old well. By adopting the above design, the newly-built top pipe well and old pipe well connecting construction method is quick in construction progress, low in disturbance of surrounding strata, investment saving and labor saving.

Description

technical field [0001] The invention relates to the field of underground pipeline construction, in particular to the field of docking of cast-in-situ reinforced concrete caisson structures. Background technique [0002] Generally, when a new pipe-jacking well is connected to an old well, slotting and buried pipes are used for construction. The slotted pipes need to be built with protective piles first, and then earthwork excavation is carried out. This process has a large amount of excavated soil, a long construction period, a lot of manpower and material resources, and has a great impact on the surrounding pipelines and structures. Contents of the invention [0003] The object of the present invention is to provide a construction method for connecting a new pipe-jacking well and an old pipe well with fast construction progress, less disturbance to surrounding strata, and reduced ground excavation area. [0004] In order to achieve the above object, the present invent...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D29/045
Inventor 郝鑫赵建立
Owner SHANGHAI ERSHIYE CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products