A construction method and drainage pipe technology, applied in the field of construction engineering, can solve the problems of large land subsidence, large soil disturbance, affecting the safety of pipelines, road traffic and ground buildings, etc., and achieve significant social benefits and fast construction progress. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0029] The construction steps of this embodiment include:
[0030] (1) Measurement and setting-out
[0031] Arrange temporary benchmarking points and pipeline axis control piles, and set up central piles at intervals of 20m during construction setting-out, and set central piles at inspection wells.
[0032] (2) Construction of working well
[0033] Install reinforced concrete prefabricated slabs in the slots reserved at the top of the working well, and the slots must be filled with grout. Build a brick wall at the reserved opening of the prefabricated slab. All bricks should be soaked in water. During the masonry, they should be fully paved and crowded, and built up and down. The thickness of the horizontal mortar joints and the width of the vertical mortar joints should be uniform, and there should be no vertical joints . When building inspection wells, steps should be installed synchronously, and the positions should be accurate. After the steps are installed, the steps s...