Novel combined soft water closed circulation cooling system
A circulating cooling system and soft water sealing technology, applied in the direction of cooling devices, etc., can solve the problems of large amount of water in the subsystem, the investment and operating costs are not the most economical, and the configuration method of the combined soft water closed circulating cooling system is unreasonable, so as to reduce operating costs. , the effect of reducing the number of pipelines and reducing operating costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0014] Embodiment one, as attached figure 1 As shown, the soft water pressurized by the main water supply pump group 13 is divided into two parts in front of the furnace, a part of the furnace bottom water cooling pipe 1 and stave serpentine pipe 2 in series are cooled, and a part of the cooling stave direct cooling pipe 3 is cooled. The water enters the stave return water main circulation pipe, and the soft water coming out of the stave return water general circulation pipe is divided into three parts, one part can directly enter the degassing tank 10 through the bypass shunt pipe 14, and the other part passes through the hot air valve booster pump group 4 The pressurization is used for the hot air valve 5; the other part is pressurized by the booster pump group 6 of the small tuyere set, and is used for the small tuyere 7. After cooling the soft water of the small tuyere 7, it is supplied to the parallel tuyere middle set 8 and the direct blowing pipe. 9 use; these two parts...
Embodiment 2
[0016] Embodiment two, as attached figure 2 As shown, the soft water pressurized by the main water supply pump group 13 is divided into two parts in front of the furnace, a part of the furnace bottom water cooling pipe 1 and stave serpentine pipe 2 in series are cooled, and a part of the cooling stave direct cooling pipe 3 is cooled. The water enters the stave return water main circulation pipe, and the soft water coming out of the stave return water general circulation pipe is divided into three parts, one part can directly enter the degassing tank 10 through the bypass shunt pipe 14, and the other part passes through the hot air valve booster pump group 4 Supercharging is supplied to the parallel hot air valve 5 and the small tuyere booster pump group 6. The soft water pressurized by the hot air valve booster pump group 4 is pressurized in series by the tuyere small booster pump group 6 and then supplied to the tuyere small set 7. After cooling the soft water in the tuyere ...