Generating method for power grid topological relationship based on Arcgis
A technology of power grid topology and relationship, applied in the field of urban distribution network of smart grid, can solve problems such as complicated steps, error-prone, and high requirements for drawing personnel, and achieve the effect of high efficiency and good user experience
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0034] The technical solution of the present invention can adopt computer software technology to realize the automatic operation process. The present invention will be further described below in conjunction with the accompanying drawings and examples, but the following examples should not be construed as limiting the present invention. see Figure 4 , the flow process of the embodiment is as follows:
[0035] Step 1. Carry out spatial analysis on the spatial elements drawn on Arcgis to form the spatial connection relationship of the elements;
[0036] Calculate the spatial connection relationship according to the spatial position of the Arcgis element and the attribute of the line to which the element belongs, and calculate the sensitive threshold parameter of the space perception to process the connection error in the process of spatial graphics drawing, and enhance the effective connection area, so as to obtain the equipment resource. connection relationship.
[0037] Imp...
Embodiment
[0091] The embodiment adopts the following two steps to realize:
[0092] Step 2.2.1, write the outlet node into the topology tree table, the filling method of the topology tree table in the embodiment: the parent connection point and the root connection point are 0; the node depth is 1; the parent node resource ID and the root node resource ID are disconnected in the station Connector resource ID; connection point: use the outgoing resource ID to find the connection point that has a terminal among all the connection points on the line (a terminal is a record).
[0093] In step 2.2.2, the outlet node connected to the circuit breaker is used as the starting point of the analysis, and written into the temporary analysis table tmp_currtermce. In this embodiment, the outgoing node connected to the circuit breaker is obtained by querying the records whose node depth is 1 in the table top_tree.
[0094] Step 2.3, add 1 to the node depth in memory.
[0095] In step 2.4, the currently...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com