Method for processing vehicle bump at bridge head of existing highway
A bridge head jumping and expressway technology, applied in the field of civil engineering, to achieve the effect of simple equipment, reducing additional stress, and reducing post-construction settlement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] Such as Figure 1~Figure 4 As shown, the pile foundation of the bridge section (11) is driven into the bearing layer (13), and the bearing layer (13) is generally bedrock, so the bridge section (11) has almost no settlement, while the lower part of the embankment (3) at the bridgehead section is The foundation soil (12) generally produces a certain amount of settlement under the action of additional stress. Therefore, there will be differential settlement between the bridge section (11) and the embankment (3) at the bridge head section, so that vehicles will jump when passing by, that is, bridge head jumping.
[0040] In order to solve the problem of vehicle jumping at the bridge head, it is necessary to try to reduce the settlement of the embankment (3) at the bridge head section. By adopting the method of the present invention, when constructing on embankment slopes, the heavy embankment filling is replaced with lightweight materials (1), reducing loads, thereby redu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com