The invention belongs to 
traffic engineering, in particular to the field of highway construction, and in particular relates to a variable rigidity 
treatment system for vehicle 
jumping at a bridge head of a highway. According to different treatment objects and settlement control standards, a foundation is reinforced by adopting treatment 
modes of a 
pile foundation, a long and short combined rigid 
pile composite foundation and a long-plate short-
pile combined loading foundation. For a bridge 
abutment foundation, the vertical rigidity of a pile foundation of the bridge 
abutment foundation is properly reduced, and the settlement of a bridge self is controlled in the allowable range of the bridge self; for a bridge head foundation, the treatment technology of the long and short combined rigid pile composite foundation is adopted, and a rigid pile can be selected from a low-strength concrete pile, a CFG pile or a prestressed tubular pile and the like according to the concrete 
engineering requirements and geological conditions; and after leaving a certain distance from the bridge 
abutment, the foundation is reinforced by adopting the treatment mode of the long-plate short-pile combined loading foundation, the 
bearing capacity of a 
shallow foundation is improved and the settlement amount is reduced by using short piles (
cement-soil piles or low-strength piles), and a drainage 
concretion process of soft soil under the pile bottoms is quickened by combining an upper loading 
system through a plastic drainage board so as to achieve the aim of shortening the construction period and reducing post settlement or differential settlement.