Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

99results about How to "Solve the jump" patented technology

Calibration method and device for battery voltage sampling

The invention discloses a method and a device for the calibration of battery voltage sampling and comprises the following steps: the invention uses a sampling module of the equipment which uses the battery for implementing the output voltage sampling of a controllable voltage source and acquires a reference sample value, and the output voltage of the controllable voltage source is recorded as a flag voltage value which forms a voltage reference point together with the reference sample value acquired from the voltage sampling, and then the invention changes the output voltage of the controllable voltage source for carrying out the sampling once again, thus acquiring a plurality of voltage reference points; the invention acquires the sampling value of the battery voltage through the battery voltage sampling, and computes the battery voltage through the sampling value of the battery voltage, the reference sample value in the voltage reference points which is close to the sampling value of the battery voltage and the flag voltage value which is corresponding to the reference sample value. The method can solve the problems of inaccurate sampling and oscillation when an on-chip analog-to-digital conversion module which has comparatively poor performance is used for the battery voltage sampling, and prevent the value offset problem which is introduced by the on-chip analog-to-digital conversion module.
Owner:ZTE CORP

Method for processing vehicle bump at bridge head of existing highway

The invention discloses a method for processing vehicle bump at a bridge head of an existing highway, and the method comprises the following steps: mixing lightweight materials at a construction site; drilling holes from embankment slopes on both sides of the highway, and automatically discharging soil outward from a threaded opening while rotatably drilling holes; after a designed depth reaches, rotatably and slowly pulling out a drill rod, and starting a booster pump so as to pump the lightweight materials into the obtained drill holes by virtue of a central tube of the drill rod; and jetting the lightweight materials from the central hole of the drill rod so as to gradually fill the hole from bottom to top, thereby replacing the filled soil of an embankment. The drill holes are arranged squarely or quincuncially on the side slope of the embankment, a certain included angle is formed between each drill hole and a horizontal plane, and the elevation of the opening of each hole is positioned below a pavement structure layer and above the underside of the filled soil of the embankment. By using the method disclosed by the invention, the weight of the embankment is greatly reduced, thereby reducing the settlement after construction caused by embankment loads and then effectively solving the problem of vehicle bump at bridge heads. During the construction period, the highway is not required to be closed, therefore, the normal traffic of the highway is not affected. The method disclosed by the invention is simple in construction process, convenient to operate, simple in equipment, economical, and high in efficiency.
Owner:HOHAI UNIV

Treatment method and structure of bridge-head foundation sliding settlement

The invention discloses a treatment method of bridge-head foundation sliding settlement. The method includes the steps: a, arranging strengthening piles; b, grouting settlement positions of a highway pavement. At least one row of strengthening piles are arranged on a bridge-head conical protection slope close to a slope base, the bottoms of the strengthening piles are at least embedded into a 0.5m position below a supporting layer of a foundation, and the tops of the strengthening piles are not exposed to the protection slope. After the strengthening piles are stabilized, holes are vertically drilled downwards on a pavement shearing and sliding band, the depths of the drilling holes penetrate the pavement shearing and sliding band, grouting is performed after the holes are drilled, and grouting includes reinforcement grouting and displacement grouting. On one hand, shearing and sliding of highway side slopes and bridge-head circular arc conical slopes can be prevented, on the other hand, the highway foundation can be reinforced, the pavement is lifted, the influence of driving on a highway is low as a construction period is short, and the treatment method is applicable to solving the problem of bridge-head bumping of pavement settlement caused by lateral sliding of bridge-head roadbeds.
Owner:CENT SOUTH UNIV

Method for synchronizing host parameter of three-scale redundancy control system

The invention relates to a synchronizing method for host parameters of a triple redundancy control system, belonging to the redundancy control field and adopting a method of point-to-point request-response combining timestamp to carry out the parameter synchronization to two hosts in the system. The synchronizing method is as follows: after initialization, a new power up host judges whether other host is on line at first. If other host does not on line, operating according to parameters directly and outputting; if other host is on line, sending a request packet to the host, and the request packet comprises a timestamp T1 when the packet leaving; and then the online host receives the request packet and fills a time stamp T2 when the packet arriving, the parameters that need to be synchronized is packed, a time stamp T3 when a respond packet leaving is filled in and is sent back to the new power up host; the new power up host receives the respond packet and fills a time stamp T4. According to the four timestamps, the network delay (T4 minus T3) from sending the respond packet by the online host to receiving by the new power up host and a clock excursion theta between two hosts are calculated, and a synchronic parameter is corrected by the value of (T4 minus T3) plus theta. The method of the invention eliminates the affect of clock excursion and network delay to the parameter synchronization, solves the output change when the system host switches and ensures the stability and reliability of the system.
Owner:UNIV OF ELECTRONICS SCI & TECH OF CHINA

Variable rigidity treatment system for vehicle jumping at bridge head of highway

The invention belongs to traffic engineering, in particular to the field of highway construction, and in particular relates to a variable rigidity treatment system for vehicle jumping at a bridge head of a highway. According to different treatment objects and settlement control standards, a foundation is reinforced by adopting treatment modes of a pile foundation, a long and short combined rigid pile composite foundation and a long-plate short-pile combined loading foundation. For a bridge abutment foundation, the vertical rigidity of a pile foundation of the bridge abutment foundation is properly reduced, and the settlement of a bridge self is controlled in the allowable range of the bridge self; for a bridge head foundation, the treatment technology of the long and short combined rigid pile composite foundation is adopted, and a rigid pile can be selected from a low-strength concrete pile, a CFG pile or a prestressed tubular pile and the like according to the concrete engineering requirements and geological conditions; and after leaving a certain distance from the bridge abutment, the foundation is reinforced by adopting the treatment mode of the long-plate short-pile combined loading foundation, the bearing capacity of a shallow foundation is improved and the settlement amount is reduced by using short piles (cement-soil piles or low-strength piles), and a drainage concretion process of soft soil under the pile bottoms is quickened by combining an upper loading system through a plastic drainage board so as to achieve the aim of shortening the construction period and reducing post settlement or differential settlement.
Owner:TONGJI UNIV

Tipping paper placing device

The invention belongs to the technical field of cigarettes and particularly relates to a tipping paper placing device. The tipping paper placing device comprises a box body, a paper disc shaft, a brake arm and a swing arm, wherein the paper disc shaft is arranged on the box body, the rotating speed of the paper disc shaft can be controlled by the brake arm and the swing arm, one end of the brake arm is arranged on the box body, the other end of the brake arm is connected with one end of the swing arm capable of driving the brake arm to rotate, and the middle of the brake arm is attached to the surface of the paper disc shaft; the swing arm is arranged on the box body, the two ends of the swing arm can swing up and down, and the other end of the swing arm is connected with tipping paper in a sleeving way. According to the tipping paper placing device, the swing arm and the brake arm are additionally arranged, the tension of the tipping paper can be automatically adjusted, the rotating speed of the paper disc shaft can be controlled, and the phenomenon that the tipping paper skips and deviates due to the inconsistent length of the tipping paper in the paper placing process is solved. The tipping paper placing device has the advantages of reasonability in design, simplicity in structure, convenience in use, easiness in realization, reduction in defective rate and improvement in work efficiency.
Owner:HUBEI CHINA TOBACCO IND

Starting method and system for permanent magnet synchronous motor

The invention is applicable to the motor control field, and provides a starting method and system for a permanent magnet synchronous motor. On the basis of a static coordinate system and a rotor coordinate system that are frequently used in a mathematic model of the permanent magnet synchronous motor, a starting coordinate system is additionally introduced to enable an open loop run phase of the permanent magnet synchronous motor to be operated in the starting coordinate system; a closed loop run phase is converted from the starting coordinate system into the rotor coordinate system, so that the problem of jumping current and rotor speed when the permanent magnet synchronous motor is in transition from the open loop run phase to the closed loop run phase is solved, and the starting process of the permanent magnet synchronous motor can be smoothly and naturally performed; meanwhile, when the starting parameters and loads of the motor are obviously changed, the starting of the permanent magnet synchronous motor is controlled by the starting method and system provided by the invention without affecting the smoothness of the starting of the permanent magnet synchronous motor; and in addition, the starting method is high in robustness and applicable to wide promotion and use.
Owner:SHENZHEN ZHENBANG TECH

Jointless bridge based on arc structure arranged behind bridge abutment and construction method thereof

InactiveCN104213500AImprove the common fault of fragileSolve the bridge head jumping problemBridge erection/assemblySoffitExpansion joint
The invention relates to a jointless bridge based on an arc structure arranged behind a bridge abutment and a construction method thereof. The jointless bridge comprises a bridge span structure and a bridge abutment, wherein an arc structure is arranged behind the bridge abutment along the bridge direction, the arc springing at one end of the arc structure is connected to the end wall of a girder or the body of the bridge abutment while the arc springing at the other end is arranged on an independent foundation, and displacement transferred by the bridge span structure is absorbed by deformation of the arc structure. The method comprises the following steps of: 1, independently constructing foundations of the lower part structure of the bridge and the arc structure behind the bridge abutment far away from the bridge end; 2, constructing the upper part structure of the bridge; 3, constructing the arc structure behind the bridge abutment; 4, constructing a waterproof layer at the upper part of the arc structure; 5, constructing soffit packing; 6, paving a bridge deck and a road behind the bridge abutment. The jointless bridge is clear in stress, simple in structure and easy to construct, and can effectively avoid transferring the problem, that the joints at bridge ends are easy to damage, into the rod pavement structure when the bridge is jointless.
Owner:FUZHOU UNIVERSITY

Method and apparatus for determining historical trajectory of terminal

The embodiment of the invention provides a method and apparatus for determining a historical trajectory of a terminal. The method comprises the following steps: determining a target time period for generating the historical trajectory of a target terminal; selecting multiple target positioning coordinates within the target time period, wherein the distances between the target positioning coordinates and an AP deployed on a route in advance are smaller than a preset distance threshold; determining multiple paths between each two target positioning coordinates with adjacent times as first suspected routes; calculating the distance between each first suspected route between the each two target positioning coordinates with adjacent times and the target terminal; determining the first suspectedroute having the minimum distance with the each two target positioning coordinates with adjacent times as a first matched route; and connecting the first matched routes to generate the historical trajectory of the target terminal. By application of the method and apparatus provided by the embodiment of the invention, when the offset between the generated historical trajectory and the actual trajectory of the terminal is reduced, the skipping problem of the historical trajectory is avoided, and the user friendliness of the historical trajectory of the terminal is improved.
Owner:NEW H3C TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products