A technology for transmission lines and multiple circuits on the same tower is applied in the field of risk probability assessment of power transmission types. , the model theory is rigorous, and the evaluation results are credible.

Active Publication Date: 2012-11-28
ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +2
View PDF3 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, compared with tower multi-circuit power transmission and conventional single-circuit power transmission, the most prominent reliability problem is that the failure rate of common mode failure will be greatly increased. The failure mode of multi-circuit should include independent failure, aging failure, common cause failure, Overlap fault etc.
Therefore, simple combination modeling is not enough to obtain an accurate reliability model of multiple circuits on the same tower
In

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Same-tower multi-loop transmission circuit risk probability assessment method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The risk probability assessment method for multi-circuit transmission lines on the same tower proposed by the present invention divides the probability risk value of the multi-circuit transmission line project on the same tower into two parts, the external risk value and the internal risk value, based on the full probability cause analysis. Different ideas and methods for modeling and evaluation analysis.

[0025] The external risk value is based on the meteorological and environmental investigation and analysis of the area where the V multi-circuit transmission line on the same tower is located, statistical analysis of the occurrence probability and duration of particularly severe weather; The influence of external environment such as ice, snow, thunderstorm, bird damage on the operation reliability of multi-circuit transmission lines on the same tower, and estimate its reliability index.

[0026] The internal risk value adopts the classic separation model combination ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a same-tower multi-loop transmission circuit risk probability assessment method, comprising the following steps of: assessing each external risk value of a same-tower multi-loop transmission circuit through a statistical analysis method; modeling in a combined manner, and assembling each internal risk value of the same-tower multi-loop transmission circuit by combining the statistical analysis method; and accessing a total probability risk index value by combining each external risk value and each internal risk value according to a total probability formula. The same-tower multi-loop transmission circuit risk probability assessment method provided by the invention can be comprehensively and entirely realized, and reliable parameter estimation and reasonability analysis can be carried out by operating statistical data through a power transmission and transformation facility with national and local calibers, so that a rigorous mould principle, reasonable parameters and a credible assessment result can be realized. The invention provides a probability risk assessment method in a super-grid popularization same-tower multi-loop technology, and provides quantitative reliable assessment and engineering auxiliary criterion for the super-grid popularization same-tower multi-loop technology.

Description

technical field [0001] The invention belongs to the technical field of transmission network reliability assessment, and in particular relates to a risk probability assessment method for complex transmission types such as multi-circuit transmission lines on the same tower. Background technique [0002] With the continuous advancement of the urbanization process, land resources are becoming increasingly scarce, and the land available for transmission line corridors is decreasing. It is necessary to increase the transmission capacity per unit line corridor width. As the load increases year by year, the transformation of urban power grids cannot be stagnant. Affected by urban planning, the transformation of the power grid is often limited to the original corridors. In order to increase the transmission capacity, it is necessary to increase the voltage level and increase the transmission loop. Removing old lines and building new ones in the original line corridor, boosting volta...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q50/06
Inventor 曾勇刚金小明姚文峰陈建福黄志伟张东辉钟杰峰孙景强冯晓东余欣梅鲁宗相
Owner ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products