Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for jointly scheduling power generation load by using wind power generation unit and thermal power generation unit

A technology of power generation load and joint dispatching, which is applied in the direction of AC network voltage adjustment, power network operating system integration, information technology support system, etc., can solve the problems that cannot fully meet the compensation of wind power load, and achieve the effect of reducing power generation costs and reducing waste

Inactive Publication Date: 2012-12-12
NORTH CHINA ELECTRIC POWER UNIV (BAODING)
View PDF3 Cites 39 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The load adjustment range of a typical thermal power unit is 50% to 100% of the rated load, and the adjustment rate is 1.5% of the rated load per minute, which cannot fully meet the requirements of compensating the wind power load.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for jointly scheduling power generation load by using wind power generation unit and thermal power generation unit

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] In order to improve the ability of the power grid to absorb the disturbing power generation load of wind power generators, the present invention proposes a method for jointly dispatching power generation loads of wind power farms in a certain area or belonging to the same power generation group, circulating fluidized bed units and heating units. In the method, the above three types of generating units are equivalent to a virtual generating set, and a unified load command is issued by the power grid side, and the load command is decomposed on the generating set side according to the different characteristics of each generating set, so as to realize the maximum power generation operation and circulation of the wind turbine generating set. The fluidized bed unit operates with variable load in a wide range, and the heating unit operates with variable load at high speed. Improve the safety of the grid side and the economy of the power generation side after the large-scale gri...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for jointly scheduling power generation load by using a wind power generation unit and a thermal power generation unit. A wind power plant, a circulating fluidized bed unit, a heating unit and the like which are within a same area or belong to a same power generation group are equivalent to a virtual unit, unified load instructions are issued from a power grid side, and the load instructions are decomposed on a unit side according to characteristics of various units to realize operation of the wind power plant at the maximum power generation power, wide-range variable load operation of the circulating fluidized bed unit and high-rate variable load operation of the heating unit. Mutual coordination of the wind power plant, the circulating fluidized bed unit and the heating unit is realized under the joint scheduling of a power grid, advantages of each unit are fully utilized, capacity of the power grid to receive wind power generation load is greatly improved, and the maximum-power operation of the wind power plant is realized while safety in operation of the power grid is guaranteed, so that waste of wind energy is reduced and power generation cost and environmental pollution are reduced.

Description

technical field [0001] The invention relates to a method for jointly scheduling power generation loads of a wind turbine unit, a circulating fluidized bed unit and a heating unit, and belongs to the technical field of power generation. Background technique [0002] Wind power is a clean and renewable energy generation method that has developed rapidly in the past decade. Taking China as an example, a large number of wind power plants are connected to the grid to generate electricity in the northwest, north, northeast and southeast coastal areas. With the increase of wind turbine unit capacity and the large-scale development of the wind power industry, the construction and operation costs of wind turbines have been continuously reduced, the economic advantages of wind power have gradually emerged, and the profitability of wind power enterprises has increased significantly. [0003] It is difficult to store electric energy on a large scale. The grid side needs to dispatch the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02J3/14
CPCY04S20/224Y02B70/3225Y04S20/222
Inventor 刘吉臻王琪田亮刘鑫屏
Owner NORTH CHINA ELECTRIC POWER UNIV (BAODING)
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products