Examples
Embodiment 1
[0042] Example 1: Slope No. 39 6°
[0043] The construction steps and requirements of the sloped roof of the building from bottom to top are as follows:
[0044] (1) Protective layer 4: 30-40mm thick C20 fine stone concrete, 6m×6m grid.
[0045] (2) Root resistance layer 5: The composite copper base SBS modified asphalt root puncture-resistant waterproof membrane is used.
[0046] The roof is fully laid.
[0047] (3) Arrange drainage garden road device 13: Φ110 permeable pipe 14 is laid in the garden road. Garden Road Filling Particle Size
[0048] 100-150mm drainage blocks 15, the bottom of the permeable pipe 14 is paved with crushed stones 16 with a particle size of 30-60mm (see image 3 ).
[0049] (4) Drainage layer 6: use body-shaped cross-linked copolymer rubber porous drainage board, empty laying, no glue
[0050] bonding.
[0051] (5) For the water-retaining layer 7, a 5.5mm non-woven fabric is selected as the raw material.
[0052] (6) For the filter layer 8...
Embodiment 2
[0056] Example 2: Slope No. 7 44°
[0057] The construction steps and requirements of the sloped roof of the building from bottom to top are as follows:
[0058] (1) Protective layer 4: 30-40mm thick C20 fine stone concrete, 6m×6m grid.
[0059] (2) Root resistance layer 5: The composite copper base SBS modified asphalt root puncture-resistant waterproof membrane is used.
[0060] All roofing
[0061] (3) Arrange drainage garden road device 13: Φ110 permeable pipe 14 is laid in the garden road. The garden road is filled with drainage stones 15 with a particle size of 100-150mm, and the bottom of the permeable pipe is paved with crushed stones with a particle size of 30-60mm 16 ( image 3 ).
[0062] (4) Drainage layer 6: use body-shaped cross-linked copolymer rubber porous drainage board, and use glue to bond.
[0063] (5) Water retention layer 7: choose 5.5mm non-woven fabric as the raw material.
[0064] (6) Filter layer 8: choose 3.5mm non-woven fabric as raw materi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com