A construction technology and static pressure pipe technology, which is applied in the direction of sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of pipe pile body pinching and crushing, pipe pile longitudinal cracks, etc., so as to reduce the project cost and keep the site clean , the effect of less interception
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
example 1
[0010] Example 1. Combined with the specific description of the construction of static pressure piles on a construction site
[0011] (1) Preparatory work before pile pressing
[0012] 1. Selection of pile driver: The pile driver must be accurately selected according to the geological data of the specific project and the designed single pile bearing capacity requirements. If the tonnage of the pile driver is too small, the pile may not be able to be pressed down, so the design bearing capacity requirement cannot be met; on the contrary, if the tonnage of the pile driver is too large, machine sinking may easily occur. Therefore, the pile driver should be reasonably selected in conjunction with the relevant departments, and overloaded construction should be used as much as possible. In general, the pile driving force of the pile driver should not be less than 1.2 times the standard value of the vertical ultimate bearing capacity of a single pile.
[0013] 2. Construction setti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com