Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

38results about How to "No tensile stress" patented technology

Piezoelectric hospital call signal generator

The invention relates to a piezoelectric hospital call signal generator and belongs to the technical field of a medical electronic product. The end portion of a side wall of a housing is connected with an upper cover having a through hole. The upper cover is provided with a circuit board through washers, and the circuit board is provided with an energy conversion circuit and a signal emission system. The side wall of the housing is connected with a vibrator base. The vibrator base is equipped with a group of piezoelectric vibrators through a press plate. The piezoelectric vibrators are separated by separator plates correspondingly. Each piezoelectric vibrator is in an arc structure formed by a substrate and a piezoelectric sheet, which are glued together, wherein the bending radius of the substrate is smaller than the bending radius of the piezoelectric sheet. A bottom wall of the housing is provided with a square sink groove, which is internally equipped with a guide bar. The guide bar is provided with a reset spring, a lower short rigid block, a lower flexible dial slice, a lower long rigid block, a middle short rigid block, a middle flexible dial slice, a middle long rigid block, an upper short rigid block, an upper flexible dial slice, an upper long rigid block and a button in sequence from the bottom up. A small end of the button passes through the through hole in the upper cover, and the upper surface of a big end of the button is abutted against the upper cover; and the bottom wall of the housing is connected to a sickbed.
Owner:ZHEJIANG NORMAL UNIVERSITY

Static pressure construction technology of prestressed pipe piles

The invention relates to the technical field of construction, in particular to a static pressure construction technology of prestressed pipe piles. The static pressure construction technology of the prestressed pipe piles is characterized in that before the prestressed pipe piles are pressed, a pile driver is reasonably selected according to geological data of a project and the designed requirement for the bearing capacity of the single pile, piling pressure of the pile driver needs to be no lower than 1.2 times a vertical ultimate bearing capacity standard value of the single pile, the positions of the prestressed pipe piles are checked one by one according to a building and structural pile position graph, all present pile tips are measured, related dimensions, such as the external diameter, the wall thickness, a pile body, the length, the bending degree of the pile body, and especially the thickness of the pipe wall, of each prestressed pipe pile are measured, and due to the fact that clamping force in the process of construction through a static pressure method is large, the prestressed pipe piles can be easily broken due to clamping when the wall thickness is not large enough. The static pressure construction technology of the prestressed pipe piles has the advantages that in the process of construction, noise is low, vibration and pollution are not caused, construction can be continuously carried out for 24 hours, and the construction period is shortened.
Owner:李孝虎

A method for removing an upper structure of an overwater thin-cable system cable-stayed bridge

ActiveCN109695206AReduce time spent on fairwayEnsure safetyCable-stayed bridgeBuilding repairsCable stayedCrusher
The invention discloses an overwater thin-cable system cable-stayed bridge upper structure removing method which comprises the following steps: S1, temporary buttresses are arranged near a main tower,and the temporary buttresses are made to be supported below a solid section of a bridge body main beam; S2, a stay cable on the side span side is removed, and a cable force is adjusted to keep the cable force of the stay cables on the two sides of the main tower in symmetrical balance; S3, the first cable force and the second cable force are symmetrically released, a hanging hole beam is removed,and the hanging hole beam is hoisted by adopting a large floating crane; the third cable force and the fourth cable force are symmetrically released, a mid-span beam is removed and hoisted by adopting the large floating crane; a fifth cable force is symmetrically released, a mid-span cross beam is removed and hoisted by adopting the large floating crane; the stay cables are removed; longitudinalbeams, edge beams and the main tower are disassembled in a segmented mode, and all the components are hoisted through the large floating crane; and S4, the hoisted components are conveyed to a wharf along a designed route and transferred to a sand field and crushed the in the sand field by a crusher, and the components are sent to designated positions in a partitioning manner. The method has the advantages of ensuring normal passage of the channel and being safe and stable.
Owner:SINOHYDRO BUREAU 8 CO LTD

Oral cavity implant stiffener and digital processing method thereof

The invention belongs to the field of oral cavity rehabilitation, and discloses an oral cavity implant stiffener and a digital processing method thereof. The oral cavity implant stiffener comprises aconnecting rod and at least two positioning structural members, wherein the positioning structural members and implanting positions are in corresponding arrangement; each of the positioning structuralmembers is provided with a positioning part, and the running direction of each of the positioning parts is the same as that of the corresponding implanting position; the connecting rod is connected between every two positioning structural members; and the connecting rod and the positioning structural members are made from a rigid material. Compared with steel wires, the oral cavity implant stiffener is higher in rigidity, the force is easier and uniformly transferred to various implants, the entire dispersing action of jaw force is improved, and initial stage synostosis and long-term stability of the implants are facilitated. According to implant pattern digital design, the time cost and the work difficulty can be greatly reduced, a technician does not need special tuning, and the reworkpercentage does not exist almost. Because of the mechanical property and the force conduction advantages, immediate rehabilitation can be realized for more implant cases, and indication is extended.
Owner:CHENGDU DT DENTALLAB CO LTD

Prestress concrete noise barrier sound absorption inserting plate for high speed railway

The invention relates to a prestress concrete noise barrier sound absorption inserting plate for a high speed railway. The prestress concrete noise barrier sound absorption inserting plate for the high speed railway comprises a prefabricated concrete unit inserting plate and a sound absorption panel which are rectangular structural members; the sound absorption panel is connected with the prefabricated concrete unit inserting plate through a bolt; left and right sides of the prefabricated concrete unit inserting plate are provided with thickened rib columns, and the top and the bottom of the prefabricated concrete unit inserting plate are respectively provided with thickened rib beams; a groove is formed on the thickened rib beam at the bottom of the prefabricated concrete unit inserting plate; and horizontal and vertical prestress reinforcing steel bars are arranged in the prefabricated concrete unit inserting plate. The prestress concrete noise barrier sound absorption inserting plate for the high speed railway can effectively resist long-term action of pulse air load and natural typhoon load of the high speed railway of which the highest speed is 380 to 400 kilometers per hour, has good fatigue resistance performance, obvious lasting quality and remarkable noise-reducing effect; and the cost for manufacturing the prestress concrete noise barrier sound absorption inserting plate is low, and the prestress concrete noise barrier sound absorption inserting plate is convenient to install and exchange.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD +1

Hot forging forming method for cylindrical forged piece

The invention discloses a hot forging forming method for a cylindrical forged piece. According to the hot forging forming method, hot forging cracks generated in the forming process of the cylindrical forged piece are reduced, and the qualified rate of the cylindrical forged piece is improved; the hot forging forming method is suitable for long blind hole cylindrical forged pieces with thinner wall thicknesses. The hot forging forming method comprises the following steps: firstly, manufacturing a forming die according to the design size of the cylindrical forged piece to be manufactured; secondly, manufacturing an intermediate bank; thirdly, mounting the intermediate blank in the die; fourthly, downwardly pressing a punch by a pressing machine and performing impact extrusion on the intermediate blank. By adopting the hot forging forming method, hot forging cracks generated in the forming process of the cylindrical forged piece can be reduced, the qualified rate of the cylindrical forged piece is improved, the manufacturing period is shortened, and the production efficiency is improved. Besides, according to the hot forging forming method for the cylindrical forged piece, disclosed by the invention, stress conditions of the forging and forming process can be improved, the aims of greatly improving the finished product rate, the manufacturing efficiency and the qualified rate of the forged piece are achieved, and the manufacturing risk and the manufacturing cost are reduced. Meanwhile, the hot forging forming method is suitable for the long blind hole cylindrical forged pieces with the thinner wall thicknesses.
Owner:CHINA ERZHONG GRP DEYANG HEAVY IND

Vibration isolation and reduction bracket for cable structures

The invention discloses a vibration isolation and reduction bracket for cable structures, comprising a support member (1), a vibration isolator (3), a hydraulic vibration reducer (6), a spring (7), a regulating nut (5), and a connecting pedestal (4). An adjustable combined vibration reducer (B) is composed of the spring (7), the hydraulic vibration reducer (6) inside the spring and the regulating nut (5), wherein the spring (7) provides support force, stiffness and reset ability, the regulating nut (5) regulates the length of the spring (7) to ensure that there is no tensile stress at a support member the root (A) in the balanced position, and the hydraulic vibration reducer (6) plays a role in in-plane buffer, displacement control, energy consumption and vibration reduction. The vibration isolator (3) produces shear deformation and consumes energy, and can reduce out-of-plane longitudinal vibration caused by action of the support member (1). By adopting the vibration isolation and reduction bracket for cable structures, fracture or fatigue damage of the support member root (A) caused by in-plane and out-of-plane three-direction vibration is solved, the redundancy of cable structures is enhanced, and the safety and using performance of a supported structure (2) are improved.
Owner:JIANGSU ELECTRIC POWER CO +3

Herringbone pre-stressed concrete pre-tensioning-method bridge erecting machine and application method

The invention discloses a herringbone pre-stressed concrete pre-tensioning-method bridge erecting machine. The herringbone pre-stressed concrete pre-tensioning-method bridge erecting machine comprises a herringbone steel frame, a pushing device, a top windlass, an I-shaped steel rail, a rail windlass, a supporting jack, a pre-stressed steel bar and an integrated bottom die; the herringbone steel frame comprises a front supporting leg set and a rear supporting leg set; the front supporting leg set comprises a second top gear, a front supporting leg, a second retractable sleeve and a slidable transverse beam, which are connected in sequence; the rear supporting leg set comprises a first top gear, a rear supporting leg, a first retractable sleeve and a fixed end anchoring part, which are connected in sequence; the fixed end anchoring part is connected with an embedded part on a first-row bridge pier; the first top gear is engaged with the second top gear; the pushing device is connected with the front supporting leg and the rear supporting leg; the slidable transverse beam is connected with the second retractable sleeve, and can slide on the I-shaped steel rail; one end of the tensioned pre-stressed steel bar is anchored at a pier top of the first-row bridge pier, and the other end of the tensioned pre-stressed steel bar is anchored on the slidable transverse beam through an anchor clamping sheet. The herringbone pre-stressed concrete pre-tensioning-method bridge erecting machine does not occupy a space under a bridge, and the construction efficiency of the bridge is improved.
Owner:WUHAN UNIV OF TECH

Prefabricated assembly type pier column and top cap connecting structure and construction method thereof

The invention provides a prefabricated assembly type pier column and top cap connecting structure and a construction method thereof. The connecting structure comprises a prefabricated pier column and a prefabricated top cap, an anti-shearing tenon is arranged on the top of the prefabricated pier column, an anti-shearing groove is formed in the bottom of the prefabricated top cap, prestressed tendons and connecting steel bars are arranged in the prefabricated pier column, and a plurality of embedded corrugated pipes are arranged in the prefabricated top cap; and pore channels are reserved in the pre-buried corrugated pipes, the pore channels correspond to the prestressed tendons and the connecting steel bars one to one, and the prefabricated pier column and the prefabricated top cap are spliced through splicing seams. The prestressed tendons are arranged, so that the crack resistance of the splicing seams is improved, and the post-earthquake self-resetting capability and the connection reliability are enhanced; the splicing seams are made of ultra-high performance concrete or epoxy mortar, so that the splicing seams can bear certain tensile stress without cracking, and the durability of the splicing seams is improved; the reinforced concrete anti-shear tenons and the anti-shear grooves are arranged to form a mortise and tenon structure, and the joint anti-shear capacity is high; and the connecting structure is particularly suitable for splicing the prefabricated pier column and the top cap in a large cantilever top cap T-shaped pier or an overline frame type pier.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

Bamboo-steel fiber reinforced concrete composite beam

The invention discloses a bamboo-steel fiber reinforced concrete composite beam, comprising a bamboo beam, a perforated metal plate, adhesive glue and a cast-in-place steel fiber reinforced concrete layer. The bamboo beam is provided with a reserved seam in the length direction and provided with grooves at intervals; the bamboo beam and the cast-in-place steel fiber reinforced concrete layer are connected through the perforated metal plate; the lower part of the perforated metal plate is embedded into the reserved seam; the upper part and the lower part of the perforated metal plate are respectively provided with a circular upper hole and a circular lower hole; the reserved seam and the lower hole of the bamboo beam are filled with the bonding glue; the cast-in-place steel fiber reinforcedconcrete layer and the bonding glue respectively form an upper pin bolt and a lower pin bolt in the upper hole and the lower hole of the perforated metal plate; and the cast-in-place steel fiber reinforced concrete layer forms shear tenons at the positions of the grooves. Compared with a common bamboo structure, the bending rigidity of the section of the bamboo structure is greatly improved, theadverse situation of rigidity control design of the bamboo structure is thoroughly changed, and the bamboo-steel fiber reinforced concrete composite beam has the advantages of being high in bearing capacity and large in rigidity.
Owner:HOHAI UNIV

Tower-beam thrust connection device and self-anchored suspension bridge rapid construction method

The invention provides a tower-beam thrust connection device and a self-anchored suspension bridge rapid construction method. The beam end resistor is fixedly installed on the beam end reserved steelplate in the tower beam thrust connection device, the tower end resistor is fixedly installed on the tower end pressure-bearing steel plate, and the beam end resistor is connected with the tower end resistor through a thrust conductor. The method comprises the following steps: step 1, synchronously constructing the main girder and the bridge tower of the side span; step 2, installing a tower-beamthrust connection device to temporarily connect the main girder of the side span with the bridge tower; step 3, synchronously constructing the main cable erection and the main beam installation; step4, detaching the tower beam thrust connection device to complete the first system conversion; step 5, pulling the boom, removing the bracket, and completing the second system conversion. The method ofthe invention adopts the tower beam thrust connection device to realize the cooperative installation of the main cable and the main beam safely and economically, thereby greatly saving the field operation time; Its characteristic is to increase the system conversion of the main girder by one time compared with the traditional process.
Owner:CHANGAN UNIV

A piezoelectric hospital call signal generator

The invention relates to a piezoelectric hospital call signal generator and belongs to the technical field of a medical electronic product. The end portion of a side wall of a housing is connected with an upper cover having a through hole. The upper cover is provided with a circuit board through washers, and the circuit board is provided with an energy conversion circuit and a signal emission system. The side wall of the housing is connected with a vibrator base. The vibrator base is equipped with a group of piezoelectric vibrators through a press plate. The piezoelectric vibrators are separated by separator plates correspondingly. Each piezoelectric vibrator is in an arc structure formed by a substrate and a piezoelectric sheet, which are glued together, wherein the bending radius of the substrate is smaller than the bending radius of the piezoelectric sheet. A bottom wall of the housing is provided with a square sink groove, which is internally equipped with a guide bar. The guide bar is provided with a reset spring, a lower short rigid block, a lower flexible dial slice, a lower long rigid block, a middle short rigid block, a middle flexible dial slice, a middle long rigid block, an upper short rigid block, an upper flexible dial slice, an upper long rigid block and a button in sequence from the bottom up. A small end of the button passes through the through hole in the upper cover, and the upper surface of a big end of the button is abutted against the upper cover; and the bottom wall of the housing is connected to a sickbed.
Owner:ZHEJIANG NORMAL UNIVERSITY

Environment-friendly prefabricated integral comprehensive pipe gallery and assembling method thereof

The invention discloses an environment-friendly prefabricated integral comprehensive pipe gallery and an assembling method thereof. The environment-friendly prefabricated integral comprehensive pipe gallery comprises multiple pipe gallery units which are sequentially arranged in the length direction of the comprehensive pipe gallery, and each pipe gallery unit comprises a prefabricated bottom plate, a first cast-in-situ wall plate, a second cast-in-situ wall plate, a prefabricated bin separating plate and two prefabricated C-shaped outer wall plates; each prefabricated C-shaped outer wall plate comprises a main wall plate extending in the height direction of the comprehensive pipe gallery and two auxiliary wall plates which are oppositely arranged at the two ends of the main wall plate; anchoring reinforcement bars used for stretching into the first cast-in-situ wall plates are embedded into the first auxiliary wall plates; anchoring reinforcement bars used for stretching into the second cast-in-situ wall plates are embedded into the second auxiliary wall plates; and the prefabricated bin separating plates partition a pipe gallery channel into a plurality of independent pipe gallery subchannels. According to the environment-friendly prefabricated integral comprehensive pipe gallery and the assembling method thereof, all the prefabricated parts are small in section area, low inweight, simple in structure, low in comprehensive cost and excellent in structural strength and shear resistance, and site construction pollution is low.
Owner:SHANGHAI JOHNSON ARCHITECTURAL & ENG DESIGN CONSULTANTS

Self-resetting shock insulation structure system capable of preventing shock insulation layer from being pulled

The invention discloses a self-resetting shock insulation structure system capable of preventing a shock insulation layer from being pulled, and belongs to the field of building structure engineeringshock insulation. Vertical pre-stressed cables are arranged in a high-rise structure, and an inclined reinforcing support is arranged on a structure connecting layer, so that the self-resetting shockinsulation structure system with the shock insulation layer not pulled is formed. The high-rise structure is connected with a foundation through a shock insulation support, the vertical pre-stressed cable is arranged in the high-rise structure, the lower end of the vertical pre-stressed cable is anchored to the foundation, the upper end of the vertical pre-stressed cable is connected to the structure, and the inclined reinforcing support is arranged on the structure connecting layer. By adjusting the vertical pre-stress level, it is guaranteed that the shock insulation layer is not subjected to tensile stress, the shock insulation support is not subjected to tensile damage, and therefore the structure shock insulation effect under a large shock effect is guaranteed; and by adjusting the vertical pre-stress level, the height-width ratio of the shock insulation structure system can break through the limitation of a standard range, and the height of the shock insulation structure can be continuously increased compared with the height of a common shock insulation structure.
Owner:BEIJING UNIV OF TECH

Herringbone Prestressed Concrete Pretensioning Bridge Erection Machine and Its Application Method

The invention discloses a herringbone pre-stressed concrete pre-tensioning-method bridge erecting machine. The herringbone pre-stressed concrete pre-tensioning-method bridge erecting machine comprises a herringbone steel frame, a pushing device, a top windlass, an I-shaped steel rail, a rail windlass, a supporting jack, a pre-stressed steel bar and an integrated bottom die; the herringbone steel frame comprises a front supporting leg set and a rear supporting leg set; the front supporting leg set comprises a second top gear, a front supporting leg, a second retractable sleeve and a slidable transverse beam, which are connected in sequence; the rear supporting leg set comprises a first top gear, a rear supporting leg, a first retractable sleeve and a fixed end anchoring part, which are connected in sequence; the fixed end anchoring part is connected with an embedded part on a first-row bridge pier; the first top gear is engaged with the second top gear; the pushing device is connected with the front supporting leg and the rear supporting leg; the slidable transverse beam is connected with the second retractable sleeve, and can slide on the I-shaped steel rail; one end of the tensioned pre-stressed steel bar is anchored at a pier top of the first-row bridge pier, and the other end of the tensioned pre-stressed steel bar is anchored on the slidable transverse beam through an anchor clamping sheet. The herringbone pre-stressed concrete pre-tensioning-method bridge erecting machine does not occupy a space under a bridge, and the construction efficiency of the bridge is improved.
Owner:WUHAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products